Procore vs Autodesk Build (now Forma Build)
Both are enterprise-grade platforms for commercial construction, and neither publishes prices. Procore prices by product and construction volume with unlimited users. Autodesk, which now sells Autodesk Build as Forma Build, offers user, project, and account-based pricing and ties closely to its design and model tools.
Choose Procore if you want one commercial platform where every owner, sub, and vendor joins at no added user cost and your fee scales with construction volume. Choose Autodesk Build (renamed Forma Build) if your projects run on Revit and Navisworks models, your preconstruction team already uses BuildingConnected, or you want to buy per user or per project instead of on volume. Both hide prices behind a quote. Both pricing pages were checked in October 2026, and Autodesk's now says Autodesk Construction Cloud is part of Autodesk Forma.
Comparison table
| Procore | Autodesk Build (Forma Build) | |
|---|---|---|
| Published prices | No, quote only | No, quote only |
| Pricing model | Upfront annual fee per product based on Annual Construction Volume | User, project, or account-based |
| Users | Unlimited, including clients, subs, and vendors | Depends on the model you buy |
| Guarantee | Not stated on pricing page | 30-day money-back guarantee |
| Preconstruction | Designs, estimates, bids, budgets | Separate bundle: ProEst, BuildingConnected Pro, Bid Board Pro, TradeTapp, Forma Takeoff, Forma Estimate |
| Field and project delivery | Project management, quality and safety (daily logs, inspections, incidents) | Construction Operations bundle: Forma Build, Forma Data Management, Pype AutoSpecs, Pype Closeout |
| Model work | Not listed as a separate area on home page | Model Management bundle: Model Coordination, Navisworks Manage, Recap Pro and more |
| AI | Construction-specific AI agents | Not detailed on pricing page |
First, the name change
If you are searching for Autodesk Build and landing on pages about Forma, you are in the right place. Autodesk's pricing page is titled Autodesk Forma Pricing, says Autodesk Construction Cloud is now part of Autodesk Forma, and lists the field product as Forma Build. It also warns that some resources may still use older names. Use the new names when you ask for a quote so the line items match.
How pricing works
Procore charges an annual, upfront fee for each product you pick, set by your Annual Construction Volume, the total construction value you run through the platform. Users are unlimited. Field Productivity is the stated exception, priced per full-time-equivalent worker. The page also describes multi-year volume pools, pre-set rates for added volume, and renewal rate protection, and lists unlimited storage and support as included.
Autodesk's page shows no prices either. It describes flexible user, project, and account-based pricing, groups products into Model Management, Preconstruction, and Construction Operations bundles, and offers a 30-day money-back guarantee and a demo.
The models reward different companies. Take two made-up firms. A GC running $40M a year across 12 projects with 30 internal staff and 200 sub users benefits from Procore's unlimited users, but pays based on that $40M. A specialty contractor with 6 office users working inside a few large GC projects might find per-user pricing cheaper. Get both quotes on the same assumptions, and ask each to price year two and year three too.
Preconstruction
Autodesk sells a deep preconstruction stack as its own bundle. BuildingConnected Pro and Bid Board Pro handle bid invitations and tracking, TradeTapp covers subcontractor prequalification, and ProEst, Forma Takeoff, and Forma Estimate handle quantity takeoff and estimating. If your estimators already live in BuildingConnected, that is a strong pull.
Procore covers preconstruction too: designs, estimates, bids, and budgets on one platform. The advantage there is having bid, budget, and project data in the same system the field uses once the job is awarded.
Field, documents, and closeout
Procore's project management and quality and safety tools bring daily logs, inspections, and incidents together, and its mobile app links the site to the office. For a GC that needs every RFI and submittal answered by the right sub, unlimited users means that sub is already in the system.
Autodesk's Construction Operations bundle pairs Forma Build with Forma Data Management and two Pype tools: AutoSpecs, which works from project specifications, and Closeout, for closeout documents. If your closeout packages routinely run late and hold up release of retainage, ask Autodesk to demo Pype Closeout on a sample spec book.
Models and design coordination
This is Autodesk's home turf. The Model Management bundle includes Model Coordination, Design Collaboration, Navisworks Manage, Recap Pro, Assemble, Insight, and Autodesk Tandem. For a mechanical contractor running clash detection on a hospital job, being in the same ecosystem as the architect's Revit models removes file conversion steps.
Procore's home page does not list model coordination as a separate product area, so if BIM coordination drives your work, have Procore show exactly how models are viewed and shared.
Strengths and limits
- Procore strength: unlimited users, so every outside party participates without seat math.
- Procore strength: one platform from preconstruction through quality and safety, with AI agents.
- Procore limit: pricing tied to construction volume and paid annually upfront; no public numbers.
- Autodesk strength: tight fit with Autodesk design and model tools, and a broad bid management stack.
- Autodesk strength: user, project, or account pricing options plus a 30-day money-back guarantee.
- Autodesk limit: no public prices, and the product is split across bundles, so scope your quote carefully. Autodesk notes that some resources may still use previous product names.
Rollout effort
Either platform is a real implementation project, not a weekend setup. Budget for a project lead on your side, cleaned-up project templates, a standard cost code list, and a plan for what happens to jobs already in progress. Ask each vendor what training is included, who your implementation contact is, and how long a company your size usually takes to go live. Procore's pricing page points implementation and professional services to a separate support page, so ask whether any of it carries a fee.
Who should pick which
- GC with many subs and owners who all need access: Procore's unlimited-user model is built for this.
- Design-heavy or BIM-driven firm: Autodesk Build, for the model coordination ecosystem.
- Estimating team already on BuildingConnected: price the Autodesk Preconstruction bundle alongside Forma Build.
- Specialty contractor with a small office: get both quotes. Per-user pricing may cost less than volume pricing, or it may not.
- Small contractor without an IT person: both may be more platform than you need. Start with Procore alternatives or Autodesk Build alternatives.
Smart Business Automator is a newer, lighter option with published per-user pricing (Starter $19, Professional $40, Business $67, Enterprise $100 a month). It covers project tracking, invoicing, subcontractor and shipment tracking, change orders, job costing and WIP views, compliance and certified payroll preparation, and AI help with RFI drafting and document data extraction. It does not offer model coordination or the document control depth of either platform here. See our pricing.
Frequently asked questions
Is Autodesk Build the same as Forma Build?
Yes. Autodesk's pricing page says Autodesk Construction Cloud is now part of Autodesk Forma and that ACC product names were updated. The Autodesk Build link now carries the Forma Build label.
Does Autodesk Build publish its price?
No. As of October 2026 the pricing page offers quotes and describes user, project, and account-based pricing, with a 30-day money-back guarantee.
How does Procore price compared with Autodesk?
Procore charges an annual upfront fee per product based on Annual Construction Volume, with unlimited users. Autodesk prices by user, project, or account. Which is cheaper depends on your volume and headcount, so get both quotes.
Which is better for BIM coordination?
Autodesk sells a Model Management bundle with Model Coordination and Navisworks Manage, which fits teams already in Autodesk design tools. Ask Procore to demo its model viewing if BIM drives your work.
Can a subcontractor work in both?
Yes. Subs are often invited into a GC's platform. Procore says collaborators such as subcontractors are included in its unlimited-user model.