Pricing

Procore pricing explained

Procore does not publish prices. It charges an upfront annual fee for each product based on your annual construction volume (ACV), with unlimited users, so the quote depends on what you buy and how much work you put through it.

A project engineer in a hardhat and safety vest uses a rugged tablet beside steel wall framing.
Capture field information where the work happens, then route it to the people who need it. AI-generated illustration.

Procore does not list prices on its website. As described on its pricing page in October 2026, Procore charges an upfront annual fee by product, based on your Annual Construction Volume (ACV), and it does not charge for adding users. Field Productivity tools are the exception, priced by full-time equivalent headcount instead of volume. To get a number you request a custom quote. So the honest answer to how much Procore costs is: it depends on which products you buy and how many dollars of construction you run through them each year.

How Procore's pricing model works

  • Priced by product. You pick from a suite of products (for example project management or financial tools) and each is priced separately.
  • Priced by volume. The fee scales with your Annual Construction Volume, the dollar value of construction work you manage in Procore during the year.
  • Unlimited users. Procore states it will never charge for adding more users. Owners, architects, subs, and your whole team can log in.
  • Field Productivity is different. Those products are priced by FTE count, not ACV.
  • Annual contracts. Pricing is fixed for the contract year and paid upfront.

Procore also describes several contract options: multi-year pools that let you commit to a total volume over several years and draw it down, a volume opt-in to lock pricing for extra volume added mid-term, and renewal rate protection that sets future renewal rates in advance. Unlimited data storage, 24/7 support, product updates, and free role-based training and certifications are described as included.

What drives the cost

Because the meter is construction volume, not seats, two firms with the same headcount can get very different quotes. Think about it this way. A 12-person GC doing $30M a year will be priced on that $30M. A 12-person specialty sub doing $6M will be priced on its $6M. Neither pays more for adding a project coordinator.

Procore cost drivers (pricing page checked October 2026)
FactorEffect on priceWhat to ask
Annual Construction VolumeMain driver; higher volume, higher feeHow is ACV defined and verified? What if volume drops?
Number of productsEach product adds a feeWhich features are in each product?
Field ProductivityPriced per FTEWhich workers count as FTEs?
Contract lengthMulti-year pools availableWhat is the renewal rate and is it protected?
Implementation servicesSold separatelyIs a partner required? Fixed fee or hourly?
UsersNo chargeConfirm in the order form

Volume pricing also changes how you think about growth. On a seat-based tool, hiring two project engineers raises the bill right away. On Procore, it does not, but winning an extra $8M of work might, depending on how your contract handles added volume. Neither is better in the abstract. The question is which of the two grows faster at your company over the next three years: headcount or revenue. Answer that honestly before comparing quotes, and ask the sales rep to show what your bill would look like at your current volume and at 25 percent more.

Hidden costs to ask about

Procore's page states there are no hidden fees. Even so, the subscription is only part of what you will spend, and these are the line items worth getting in writing:

  1. Implementation and onboarding. Procore links to implementation services as a separate offering. Ask whether you need them, what they cost, and how long setup takes.
  2. Volume true-up. If your annual volume grows past what you bought, ask how the extra is priced. The volume opt-in option exists for this.
  3. Integrations. If you connect accounting or payroll, ask what is native, what needs a partner app, and whether that partner charges separately.
  4. Internal admin time. A tool with unlimited users still needs someone to set up projects, permissions, cost codes, and templates.
  5. Year two and renewal. Get the renewal rate in the contract; Procore offers renewal rate protection, so ask for it.

Who Procore pricing suits, and who it does not

Procore's model works best for general contractors and owners who want everyone on a job (subs, architects, inspectors) in one system without counting seats. If your team is large relative to your revenue, unlimited users are a real advantage. If your revenue is high but your office is small, a per-user product may cost less. A $20M concrete sub with four people in the office is the classic case where seat pricing wins.

How Procore compares with tools that publish prices

Published pricing for comparison, checked October 2026
ProductPricing modelPublished price
ProcoreAnnual fee by product and construction volume; unlimited usersQuote only
FieldwirePer user per monthBasic free (5 users, 3 projects); Pro $39, Business $64, Business Plus $89 billed annually
JobTreadBase fee plus tiered per user$199/mo base plus $20/user for users 2 to 10 (monthly)
ProjulTiers by user count$199 to $1,199/mo billed annually
KnowifyTiers; extra users $29/moFrom $99/mo; Enterprise by quote

These are not like-for-like products. Fieldwire is mainly plans, tasks, and field management, with RFIs, submittals, change orders, and budget on its top plan. JobTread and Projul lean residential. For a full list, see Procore alternatives, Procore vs Buildertrend, and Procore vs Autodesk Build. The total cost of ownership over three years is a fairer comparison than the first-year quote.

Getting a useful Procore quote

  1. Decide which products you need now and which can wait a year.
  2. Have your annual construction volume ready, split by the work you will manage in Procore.
  3. Ask for one-year and multi-year pricing side by side.
  4. Ask for implementation as a separate, fixed line item.
  5. Ask for renewal rate protection in writing.
  6. Score the demo against how to choose construction management software.

Smart Business Automator prices the other way: per user per month, from $19 on Starter to $100 on Enterprise, published on the pricing page. It is a newer and smaller product than Procore, focused on project tracking, change orders, job costing and WIP views, subcontractor compliance, and certified payroll preparation, which can suit a high-revenue, small-office contractor.

A published-price alternative to Procore: Smart Business Automator

If you want a number before a sales call, Smart Business Automator publishes its prices: per user per month from $19 (Starter) to $100 (Enterprise), with plan limits listed on the pricing page. It covers project tracking, change orders, job costing, invoicing and subcontractor compliance, and connects to the accounting and estimating tools you already use. It is in a free founding beta now, so you can apply for beta access and test it on live jobs before paying anything.

SBA projects dashboard showing five roofing jobs with contract value, cost versus budget bars, schedule status and health labels.
Every active job on one screen: contract value, cost against budget, schedule, and which jobs need attention. Product preview with sample data.

Frequently asked questions

How much does Procore cost per year?

Procore does not publish prices. It charges an upfront annual fee per product based on your Annual Construction Volume, so you need a custom quote.

Does Procore charge per user?

No. Procore's pricing page says it will never charge for adding more users. Field Productivity products are the exception, priced by full-time equivalent headcount.

Is Procore month to month?

No. Procore describes annual contracts paid upfront, with multi-year pool options and renewal rate protection available.

Does Procore charge for implementation?

Procore links to implementation and onboarding services as a separate offering, while role-based training and certifications are described as free. Ask for implementation costs as a separate line item in your quote.

What is Annual Construction Volume in Procore pricing?

It is the dollar value of construction work you manage through Procore in a year. Ask Procore how it defines and verifies the figure for your company.

Sources

  1. Procore: Pricing
  2. Fieldwire: Pricing
  3. JobTread: Pricing
  4. Projul: Pricing
  5. Knowify: Pricing
Written and edited by

Maurice Francois writes and edits construction operations guides for Smart Business Automator. More from Maurice on the Scaling Legends podcast.

Get a free assessment