Remodeling estimate template
A remodeling estimate breaks the job into phases and separates your own labor, materials, subcontractor quotes, and allowances, so the homeowner can see what is fixed and what depends on their selections. Download this template as a CSV or print it.
A remodeling estimate template organizes a kitchen, bath, or whole-floor remodel into phases (demo, framing, mechanical trades, cabinets, tops, finishes) and prices each one in four buckets: your own labor, your materials, subcontractor quotes, and allowances for items the homeowner has not picked yet. Separating those buckets is the whole point. A remodel price is part known cost, part trade bids, and part a guess about taste, and the estimate should show which is which.
Take a kitchen in a 1960s house. You know the demo. The electrician and plumber have walked it and sent numbers. But the homeowner is still choosing between two cabinet lines that differ by thousands of dollars, and nobody knows what is behind the soffit. A good estimate prices the first two firmly, carries the cabinets as an allowance, and says plainly what happens if the soffit hides a duct.
What a remodeling estimate is for
Internally, it is your cost build and your budget for job costing once the job starts. Each line becomes a cost code you track actuals against. Externally, it feeds the proposal and the contract, which should list the scope by phase, the allowances with their dollar amounts, the exclusions, and the payment schedule. Many remodelers show the homeowner the phase totals and allowances but not their internal labor rates.
Two federal rules often touch remodeling paperwork. In homes built before 1978, the EPA Renovation, Repair and Painting rule generally applies to work that disturbs painted surfaces beyond small minor repair limits. It requires a certified firm and renovator, lead-safe practices, and giving the owner the Renovate Right pamphlet no more than 60 days before work begins, with a signed acknowledgment that can be part of the contract. And if you sell at the homeowner's kitchen table, the FTC Cooling-Off Rule can give the buyer three business days to cancel certain home sales, so the contract you leave behind needs the cancellation notice and forms where it applies. State home solicitation laws may add more.
How to fill in each column
- Cost code: the phase or code you will job-cost against, such as 01 Demo or 06 Countertops. Use the same list on every remodel.
- Phase or item: what the line covers, specific enough to define scope: "relocate sink 4 ft, new supply and drain, connect dishwasher."
- Qty and Unit: LS for phases, LF for cabinets and trim, SF for tile, tops, and flooring, EA for fixtures.
- Labor: your own crew's cost for the line, from hours times loaded rate.
- Material: what you buy and supply, including dumpsters and protection.
- Subcontract: the quote from the trade partner, after you have checked it covers the full scope. See how to level subcontractor bids.
- Allowance: the dollar amount carried for homeowner selections. State the basis, such as per square foot for countertops.
- Line total: labor plus material plus subcontract plus allowance.
Remodeling pricing tips
Carry a contingency for concealed conditions on older houses, or write clear unit prices for the most likely ones (rotted subfloor per sheet, knob and tube wiring per circuit) and exclude the rest in writing. Price permit fees and inspection days. The schedule slips if the rough-in inspection is a week out, and your general conditions run the whole time.
Mark up subcontractor work and allowances, not only your own labor. Managing an electrician, a countertop fabricator, and a homeowner's selection calendar is real work. For margins and overhead, see how to price remodeling jobs, and for room-specific numbers, how to price a kitchen remodel.
Common remodeling estimate mistakes
- Mixing allowances into fixed prices, so nobody can tell what changes when selections come in.
- Taking a sub's quote without checking exclusions, like the plumber who prices rough-in but not fixture setting.
- No line for protection, dust control, and daily cleanup in an occupied home.
- Forgetting the drywall, paint, and trim patching that follows every electrical and plumbing change.
- Skipping lead-safe costs and paperwork on a pre-1978 house.
Related forms
Bill the job against its payment schedule with the remodeling invoice template. Put the contract together with how to write a remodeling contract, and track selections with how to handle selections and allowances with homeowners. Comparing tools? See remodeling software.
Smart Business Automator carries the signed estimate into the job as a budget by cost code, with allowances and change orders tracked against it. See estimate to project handoff automation.
Kitchen remodel estimate by phase
| Cost code | Phase or item | Qty | Unit | Labor | Material | Subcontract | Allowance | Line total |
|---|---|---|---|---|---|---|---|---|
| 01 | Demo cabinets, counters, and vinyl floor; dumpster and haul-off | 1 | LS | 1,800.00 | 550.00 | 0.00 | 0.00 | 2,350.00 |
| 02 | Widen wall opening to dining room, new header, patch framing | 1 | LS | 1,400.00 | 650.00 | 0.00 | 0.00 | 2,050.00 |
| 03 | Electrical: 6 recessed lights, 4 new circuits, under-cabinet lights | 1 | LS | 0.00 | 0.00 | 4,200.00 | 0.00 | 4,200.00 |
| 04 | Plumbing: relocate sink 4 ft, dishwasher and fridge water line | 1 | LS | 0.00 | 0.00 | 2,600.00 | 0.00 | 2,600.00 |
| 05 | Cabinets: install; cabinet allowance for owner selection | 24 | LF | 1,920.00 | 0.00 | 0.00 | 14,000.00 | 15,920.00 |
| 06 | Countertops: quartz allowance at 80.00 per SF, template and install | 52 | SF | 0.00 | 0.00 | 0.00 | 4,160.00 | 4,160.00 |
| 07 | Drywall patch, prime, and paint kitchen | 1 | LS | 1,100.00 | 240.00 | 0.00 | 0.00 | 1,340.00 |
| 08 | Tile backsplash install; tile allowance at 15.00 per SF | 30 | SF | 750.00 | 0.00 | 0.00 | 450.00 | 1,200.00 |
- Sample data only. Costs, allowances, and quantities are made up for illustration.
- Line total = Labor + Material + Subcontract + Allowance. Sample direct cost subtotal: 33,820.00.
- Allowance basis: 52 SF x 80.00 = 4,160.00 for tops; 30 SF x 15.00 = 450.00 for backsplash tile.
- Below the lines, add permit, general conditions, contingency, overhead, profit, and tax where your state requires it.
- List exclusions and unit prices for likely concealed conditions in the proposal, not just here.
Frequently asked questions
What is an allowance in a remodeling estimate?
An allowance is a dollar amount carried for an item the homeowner has not selected yet, such as cabinets or tile. If the final selection costs more or less, the difference is added or credited.
Should a remodeling estimate show subcontractor prices?
Internally, yes, on their own column. What you show the homeowner is a business choice. Many remodelers present phase totals and allowances without exposing each sub's number.
Do lead paint rules affect a remodeling estimate?
In homes built before 1978, the EPA Renovation, Repair and Painting rule generally applies to work that disturbs painted surfaces beyond the minor repair limits. Price containment, cleanup, and verification as their own costs.
How much contingency should a remodel carry?
It depends on the age of the house and how much is unknown. Some remodelers carry a contingency line; others use unit prices for likely surprises and exclude the rest. Either way, put the method in writing.
Can I open this remodeling estimate template in Excel?
Yes. Download the CSV and open it in Excel or Google Sheets, then add a formula for the line total and a subtotal by cost code.