How to start a roofing business
Form the company, get licensed where your state requires it, buy insurance before the first ladder goes up, set your price per square from real costs, and put a simple job system in place before the phone starts ringing.
To start a roofing business, you register an entity, get a tax ID, check state and local licensing, buy general liability and workers' compensation coverage, set up fall protection and a safety program, buy or rent the core equipment, build a price list per square, and line up your first customers through suppliers, referrals, and general contractors. The order matters. Insurance and licensing come before marketing, because one uninsured fall can end the company in its first month.
Step by step: starting a roofing company
- Write a short business plan. The U.S. Small Business Administration describes two formats: a traditional plan with sections such as market analysis, service line, marketing, funding request, and financial projections, or a one-page lean plan. A roofing business plan should answer three questions: residential or commercial, retail or insurance work, and which ZIP codes.
- Pick an entity and register it. Most new roofers form an LLC or corporation to separate business and personal assets. Talk to an accountant about taxes before you file. Register the name with your state, and file a DBA if you will trade under a different name.
- Get an EIN. The IRS issues an Employer Identification Number for free online. Do not pay a third-party site for it. Form the LLC or corporation with the state first.
- Check licensing. Some states license roofers as a specialty trade, some only through a general contractor or home improvement license, and some leave it to cities and counties. Start at the contractor license hub and then call your city's building department about permits.
- Buy insurance. You need general liability insurance and, once you hire, workers' compensation. Roofing is a high-risk class, so get quotes early. Many general contractors will not let you on site without a certificate of insurance naming them.
- Set up your safety program. OSHA requires fall protection for roofing on low-slope and steep roofs where the edge is 6 feet or more above a lower level. Steep roofs call for guardrails with toeboards, safety nets, or personal fall arrest. Write a fall protection plan and train the crew before the first job.
- Check lead rules for older homes. If you will disturb painted surfaces such as fascia, soffit, or trim on homes built before 1978, EPA's Renovation, Repair and Painting rule requires a certified firm using certified renovators.
- Get bonded if your market needs it. Some licenses require a license bond. Commercial and public jobs may need bid bonds and performance bonds. The U.S. Small Business Administration's Surety Bond Guarantee program backs bonds for small contractors on eligible contracts up to $9 million for non-federal work.
- Buy or rent equipment. Start lean and rent the expensive pieces.
- Set prices, then sell. Build your price per square from real costs before you knock on a single door.
Startup cost categories
No honest single number covers every new roofing company. A one-truck repair outfit and an insurance restoration shop with three sales reps start from very different places. Budget by category instead, and get real quotes for each. Then add a cushion for slow pay: on a replacement, you often pay the crew and the supplier before the final check clears, and on commercial work the general contractor may hold retainage for months.
| Category | What it covers | Notes |
|---|---|---|
| Registration and licensing | Entity filing, DBA, license fees, exams | Set by your state and city |
| Insurance | General liability, workers' comp, commercial auto | Often the largest early cost for roofers |
| Bonds | License bond, later bid and performance bonds | Premium depends on credit and financials |
| Safety gear | Harnesses, anchors, lanyards, guardrail, ladders | Required before work starts |
| Tools and equipment | Nail guns, compressor, roof brackets, tear-off tools | Rent lifts and conveyors at first |
| Truck and trailer | Work truck, dump trailer or dumpster account | Many start with roll-off rentals per job |
| Working capital | Payroll and materials before the customer pays | Supplier credit terms help |
| Software and marketing | Job tracking, measurement reports, website | Monthly costs, see roofing software |
Pricing your first jobs
Roofing is priced by the square (100 square feet of roof). Your price per square has to cover materials with waste, labor adjusted for pitch and layers, disposal, permits, overhead, and profit. New roofers often copy a competitor's number and find out in month six that their overhead is higher. Work it out yourself with how to price roofing jobs, and use a roofing estimate template so every quote has the same line items.
For labor cost, know your market. The Bureau of Labor Statistics put the median wage for roofers at $26.65 per hour in May 2025. Your actual rate depends on location and experience, and the burdened cost (taxes, workers' comp, benefits) runs well above the wage. See how to calculate labor burden.
Finding the first customers
- Supply houses. Open an account, meet the counter staff, and ask which contractors are overbooked. They often know who needs a sub.
- General contractors and remodelers. Many need a reliable roofing sub. Get on their lists with your insurance certificate ready. See how to get on general contractor bid lists.
- Repairs. Small leak repairs build reviews and turn into replacements later.
- Property managers. Steady repair and maintenance work, paid on terms.
- Neighbors of every job. A yard sign and door hangers on the street while the crew works are cheap and work.
Systems to set up in month one
Set up a simple pipeline (lead, inspected, quoted, signed, scheduled, complete, paid), a standard contract with a deposit and payment schedule, a photo routine for every roof, and basic job costing so you know what each roof actually cost. Smart Business Automator handles project tracking, invoicing, change orders, and job costing for small roofing companies, and the roofing software guide covers what else to look at.
Mistakes new roofing companies make
- Starting work before insurance and licensing are in place.
- Skipping a written fall protection plan because the crew is experienced.
- Pricing from a competitor's flyer instead of their own costs.
- Taking insurance jobs without understanding supplements and two-party checks.
- Paying for materials on a personal card and losing track of job costs.
- Not collecting a deposit or progress payment on large jobs.
- Ignoring warranty registration for the shingle manufacturer.
Frequently asked questions
Do I need a license to start a roofing business?
It depends on your state and city. Some states license roofing as its own trade, others require a general or home improvement license, and some leave it to local governments. Check your state's licensing agency before you bid.
What insurance does a roofing company need?
At minimum, general liability and commercial auto, plus workers' compensation once you have employees. Many contractors and property managers also require you to name them as additional insured.
Can I start a roofing business without crews?
Some owners start as a sales and project management company that subcontracts installation. You still need the right license and insurance, and you are still responsible for the work quality and safety on site.
What goes in a roofing business plan?
Your market (residential, commercial, insurance), service area, pricing per square, marketing plan, startup costs by category, and a monthly cash flow forecast for the first year.
Do roofers need lead paint certification?
If the work disturbs painted surfaces on homes or child care facilities built before 1978, EPA's Renovation, Repair and Painting rule requires firm certification and certified renovators. Shingle-only work may not trigger it, so check the rule for your scope.
Sources
- U.S. Small Business Administration: Register your business
- U.S. Small Business Administration: Write your business plan
- U.S. Small Business Administration: Get business insurance
- U.S. Small Business Administration: Surety bonds
- IRS: Get an employer identification number
- 29 CFR 1926.501, Duty to have fall protection (Cornell LII)
- EPA: Lead Renovation, Repair and Painting Program rules
- Bureau of Labor Statistics: Roofers, Occupational Outlook Handbook