Trade estimates

Roofing estimate template

A roofing estimate prices a roof by the square, adds waste for cuts and starter, and breaks out tear-off, underlayment, flashing, and labor so the number holds up. Download this template as a CSV or print it.

Two construction professionals review paper plans beside a tablet at a jobsite workbench.
Plan reviews connect field conditions, drawings, and the next decisions on a job. AI-generated illustration.

A roofing estimate template turns your roof measurements into a price you can defend. Each line covers one piece of the system (tear-off, underlayment, ice barrier, shingles, metal, ventilation, penetrations) with the measured quantity, a waste factor, the order quantity, material cost, and labor. Roofers price in squares, where one square covers 100 square feet of roof, so the template is built around that unit. Fill it in from your measurement report or your own takeoff, add overhead and profit below the lines, and the proposal practically writes itself.

Say a 32 square reroof comes in on a Tuesday and the homeowner wants a number by Thursday. With a consistent sheet, the estimator spends the time on the roof, not on rebuilding a spreadsheet.

What a roofing estimate sheet is for

This is your internal cost build. The homeowner or general contractor sees a cleaner proposal with scope, price, warranty, and exclusions. The estimate behind it keeps every measurement and assumption, so when a job runs long you can see whether the problem was the measurement, the waste factor, or the crew.

It also protects you on the items that cause fights later. Rotted decking, a hidden second layer, and extra flashing at a chimney all show up after tear-off. List them as unit prices on the estimate (per sheet of decking, per square of extra layer) and carry those prices into the contract. Then the change order is already priced and signed before anyone climbs a ladder.

How to fill in each column

  • Item: your line code. Keep the same codes job to job so you can compare estimates to actuals.
  • Description: specific enough that a crew lead knows the product, such as "architectural shingles, install incl. starter."
  • Measured quantity: straight from the measurement. Roof area in squares, eaves and rakes in linear feet, penetrations by count.
  • Unit: SQ for roof area, LF for edge metal and ridge, RL for rolled goods, EA for boots and vents.
  • Waste factor: extra material for cuts, starter, hips, and ridges. A simple gable roof needs less than a cut-up hip roof with dormers and valleys.
  • Order quantity: measured quantity plus waste, rounded up to what the supplier sells.
  • Material unit cost: your current supplier price for that unit, not last spring's price.
  • Labor: crew cost for the line in dollars. Many shops price install labor per square and tear-off per square per layer.
  • Line total: order quantity times material unit cost, plus labor.

Roofing pricing tips

Disposal is a real cost on every tear-off. Dumpster rental, weight limits, and landfill fees vary by market, so put them on their own line. The same goes for permits, which many jurisdictions require for a reroof. Check with the local building department before you price.

Waste factors are where roofing estimates quietly lose money. Track what you actually ordered against what you used on your last 10 jobs and set your own factors by roof type. For the full pricing method, including overhead and margin by job size, see how to price roofing jobs.

Common roofing estimate mistakes

  1. Using the footprint of the house instead of the actual roof area adjusted for pitch.
  2. Forgetting starter strip, hip and ridge cap, or drip edge on rakes.
  3. No unit prices for decking or extra layers, so every surprise turns into an argument.
  4. Leaving out the dumpster, the permit, or the crane or conveyor on a tall building.
  5. Pricing the warranty system the homeowner asked about with components that do not qualify for it.

Related forms

When the job is done, bill it with the roofing invoice template, which has room for the decking and extra-layer unit prices you set here. If you are comparing tools to replace the spreadsheet, start with roofing software. For general estimating method, read how to estimate a construction project.

Smart Business Automator carries a signed estimate into the job with its lines and unit prices intact, so the crew lead and the office work from the same numbers. See estimate to project handoff automation.

Roofing estimate worksheet

ItemDescriptionMeasured qtyUnitWaste factorOrder qtyMaterial unit costLaborLine total
R-01Tear off 1 layer asphalt shingles, haul to dumpster32SQ0%320.002,240.002,240.00
R-0230 yd dumpster, delivery, pull, and disposal1EA0%1650.000.00650.00
R-03Synthetic underlayment, full deck32SQ10%3618.000.00648.00
R-04Ice and water barrier, eaves and valleys5.4RL10%695.000.00570.00
R-05Architectural shingles, install incl. starter32SQ12%36125.003,040.007,540.00
R-06Drip edge, aluminum, eaves and rakes210LF5%2211.100.00243.10
R-07Ridge vent with cap shingles48LF0%486.500.00312.00
R-08Pipe boots, replace3EA0%318.0090.00144.00

Get the roofing estimate template as a spreadsheet. Opens in Excel or Google Sheets. We may email you once about the Smart Business Automator beta.

Stored in our private lead database. See our Privacy Policy.

  • Sample data only. Quantities, waste factors, and prices are made up for illustration.
  • Order qty = Measured qty x (1 + Waste factor), rounded up. Line total = (Order qty x Material unit cost) + Labor.
  • Labor on the shingle line covers underlayment, ice barrier, drip edge, and ridge vent install; keep that rule consistent or split it out.
  • Add unit price lines with no quantity for decking replacement (per sheet) and extra layers (per square), and carry them into the contract.
  • Below the lines, add permit, overhead, profit, and sales tax where your state taxes roofing materials or labor.

Frequently asked questions

How many square feet is a roofing square?

One roofing square covers 100 square feet of roof area. A 3,200 square foot roof is 32 squares.

What waste factor should I use on a roofing estimate?

It depends on the roof. Simple gables need less waste than hip roofs with valleys and dormers. Set your factors from your own order and return history rather than a single number for every job.

Should rotted decking be in the roofing estimate?

You usually cannot see it until tear-off, so price it as a unit price per sheet in the estimate and contract. The homeowner knows the cost up front and you bill only what you replace.

Can I open this roofing estimate template in Excel?

Yes. Download the CSV and open it in Excel or Google Sheets, then add formulas for order quantity and line total so the numbers update as you change measurements.