Utah prevailing wage and certified payroll rules
Utah has no state prevailing wage law. The U.S. Department of Labor lists it as repealed in 1981, so state and local money alone does not trigger a wage schedule, but federally funded or assisted construction over $2,000 still carries Davis-Bacon rates and weekly certified payroll.
Short answer: there is no Utah prevailing wage law to comply with. The U.S. Department of Labor's table of state prevailing wage laws puts Utah in the group of states without one and records the repeal date as 1981. What remains is federal. When a Utah project is paid for or assisted with federal money and the contract is over $2,000, the Davis-Bacon Act and its Related Acts set the minimum wage and fringe for each trade, and every contractor and subcontractor on the job reports certified payroll weekly.
| Rule | Utah |
|---|---|
| State prevailing wage law | None. Repealed in 1981, per the U.S. Department of Labor |
| State or local money only | No state wage schedule; contract terms and general wage law still apply |
| Federally funded or assisted work | Davis-Bacon and Related Acts on contracts over $2,000 |
| Rate source on federal work | U.S. Department of Labor wage determinations, published on SAM.gov |
| Certified payroll | Weekly on Davis-Bacon jobs, with a signed Statement of Compliance |
| Payroll form | Federal WH-347 is optional; the weekly information is required |
| State agency rate book or portal | None for construction wages |
What no state law means for Utah contractors
Most of the paperwork contractors in neighboring states deal with simply does not exist on a Utah job paid with state or local funds. There is no state wage determination to attach to the bid, no state certified payroll filing, and no state penalty schedule for underpaying a classification. You still owe the federal minimum wage and overtime that apply to every employer, and anything the owner writes into the contract.
That last point is where people get caught. A public owner can add wage or payroll reporting clauses to its own contract even without a state statute. Read the general and supplementary conditions before you price labor, and search the bid documents for terms like wage determination, certified payroll, and Davis-Bacon. If any of them show up, the job is not a plain state-funded job.
Spotting a Davis-Bacon job in Utah
Davis-Bacon covers federally funded or assisted contracts over $2,000 for the construction, alteration, or repair of public buildings or public works. The Related Acts carry the same wage rules into projects financed through federal grants, loans, loan guarantees, and insurance. So the owner on the cover sheet tells you little. The funding behind it tells you everything.
- Federal facility work: a job let directly by a federal agency on federal property in Utah.
- Federal-aid transportation: state or local road and bridge work paid partly with federal highway funds.
- Grant and loan funded utilities: water, sewer, and similar projects backed by federal programs.
- Housing and community projects: work supported by federal housing or community development money.
- Mixed funding: a small federal share can still put the contract under federal wage rules. Ask the owner in writing which contracts and which tiers are covered.
A practical test: if the bid package includes a wage determination number and federal contract clauses, price it as a Davis-Bacon job. If the project description mentions a federal grant or loan but no determination is attached, send an RFI before bid day. Finding out after award that every hour needs federal rates and weekly reports wrecks a fixed price.
Rates, payroll, and records on federal jobs
On a covered job, the rate for each trade comes from the federal wage determination named in the contract. The Department of Labor publishes determinations on SAM.gov, the single location for federal contracting officers that is also open to the public. Federal law requires the prevailing wages and fringe benefits for similar work in the area, so price both into your rate before you add your normal labor burden.
Payroll is weekly. The Department of Labor says covered contractors must submit payrolls on a weekly basis, each one with a signed Statement of Compliance confirming the payroll is accurate and complete and every laborer and mechanic got the required rate. The WH-347 is the standard way to do it, but the form itself is optional as long as the same information is reported. Confirm at the preconstruction meeting whether subcontractor payrolls route through the prime or go straight to the owner.
Here is the kind of example that comes up. Say a Salt Lake area electrical sub carries 4 electricians and 2 apprentices on a $900,000 federally assisted building job. Every week it reports each worker's classification, hours by day, base rate, fringe, deductions, and net pay. Apprentices bring their own registration and ratio questions, so settle those before the first payroll. Our guide on apprentice rules on prevailing wage projects covers the details.
How Utah compares with Davis-Bacon states next door
Because Utah has no state law, the only rules are the federal ones. That makes Utah simpler than states that layer their own schedules and filing systems on top of federal work. If you also bid in a state with its own program, such as Washington, expect different rate sources, filing portals, and penalties there. Keep your Utah state-funded estimates and your federal-funded estimates on separate labor rate tables so the two never mix.
For the other Utah rules that touch public and private jobs, see the Utah contractor license guide, Utah mechanics lien rules, and Utah prompt payment rules. Smart Business Automator tags jobs by funding source and prepares weekly certified payroll for the federal ones; see certified payroll automation.
Frequently asked questions
Does Utah have a prevailing wage law?
No. The U.S. Department of Labor lists Utah among the states without a prevailing wage law and records the repeal in 1981. Federal Davis-Bacon rules still apply to federally funded or assisted construction contracts over $2,000.
Where do I find Utah prevailing wage rates?
On federally funded jobs, use the Davis-Bacon wage determination listed in the contract. Determinations are published on SAM.gov by county and construction type. Utah does not publish a state construction wage schedule.
Do I need certified payroll on a Utah state-funded job?
Not under state law. You need it if federal money funds or assists the project and the contract is over $2,000, or if the owner's contract requires payroll reports. Read the bid documents.
How often is certified payroll due on a Utah Davis-Bacon job?
Weekly. Each payroll needs a signed Statement of Compliance. The WH-347 form is optional, but the weekly information it captures is required.
Can a Utah city require prevailing wages on its own projects?
A public owner can write wage or reporting terms into its contracts, and you agree to them when you sign. Check the general and supplementary conditions of each bid package.
Sources
- U.S. Department of Labor, Wage and Hour Division: Dollar threshold amount for contract coverage under state prevailing wage laws
- U.S. Department of Labor, Wage and Hour Division: Construction (Davis-Bacon and Related Acts)
- U.S. Department of Labor, Wage and Hour Division: Form WH-347
Laws and rates change. Confirm current requirements with the state agency before you bid, file, or pay. This page is general information, not legal advice.