What is the WH-347 form?
WH-347 is the U.S. Department of Labor form contractors can use to submit weekly certified payroll on federal and federally assisted construction jobs covered by the Davis-Bacon and Related Acts. The form itself is optional, but weekly certified payroll is required. An authorized official signs the Statement of Compliance. Some states require their own form instead.
Form WH-347 is the Department of Labor's standard certified payroll form. The form itself is optional: DOL describes it as available for the convenience of contractors and subcontractors, and a contractor can use its own format as long as it contains the same information. The weekly payroll submission is not optional. On jobs covered by the Davis-Bacon Act and related acts, every covered contractor and subcontractor must submit payroll information each week.
DOL's form page lists the OMB control number as 1235-0008. Download the current version from DOL rather than reusing an old saved copy.
What the form covers
| Part | What goes in it |
|---|---|
| Page 1, header | Project, contract, and contractor or subcontractor details |
| Page 1, worker lines | Identifying number, journeyworker or apprentice status, labor classification, daily and total hours, rates, fringe credits, cash in lieu of fringes, gross pay, deductions, net pay |
| Page 2 | Statement of Compliance, apprenticeship program details, fringe benefit credit details, remarks, and the certifying official's signature |
The Statement of Compliance is the part that carries legal weight. The signer certifies that the payroll is correct and complete and that each worker was paid at least the required prevailing wage and fringe benefits. DOL notes that false statements are subject to penalties under 18 U.S.C. 1001. Electronic signatures are accepted, but DOL says photocopied or scanned signatures are not.
How it works week to week
Say an electrical sub has six workers on a federally funded wastewater plant upgrade. Each Monday, the payroll clerk pulls the prior week's hours by day and by classification from the timesheets. Two of the workers spent time as both electrician and laborer, so their hours are split by classification on separate lines. The clerk checks each rate against the wage determination in the contract, applies the fringe credit for the company's health plan, completes page 2, and has the owner sign it. The PDF goes to the GC, who reviews it and forwards it with its own payroll to the agency.
If a week has no work, many agencies still expect a "no work performed" payroll for that week so the numbering stays continuous. Ask the contracting agency how it wants those handled.
Common WH-347 mistakes
- Using a classification that is not on the wage determination for that job.
- Taking fringe credit without enough detail on page 2 to support it. See fringe benefit credit.
- Apprentices listed without registration details or above the allowed ratio. See apprentice ratio.
- Late or missing weeks, which can hold up the GC's payment.
- Scanned signatures on the Statement of Compliance.
Related terms
WH-347 is the most common format for certified payroll on prevailing wage work. For line-by-line instructions, see how to fill out the WH-347 form, and for state public works, check prevailing wage rules by state. Smart Business Automator prepares certified payroll from job timesheets and flags rates that fall below the wage determination; see certified payroll automation.
Frequently asked questions
Is the WH-347 form required?
The form is optional, but the weekly certified payroll is required on Davis-Bacon covered jobs. You can use your own format if it contains all the same information and the Statement of Compliance wording.
How often is WH-347 submitted?
Weekly, for each week covered work is performed, according to DOL's form page and the contract clauses.
Who signs the WH-347?
An authorized official of the contractor or subcontractor who pays or supervises the payment of the workers signs the Statement of Compliance.
Do state prevailing wage jobs use WH-347?
Some states accept it, and some require their own form or online system. Check your state's labor agency before the first payroll.