Mississippi prevailing wage and certified payroll
Mississippi does not have a state prevailing wage law, so state and local public jobs paid only with state or local money carry no state wage schedule. Federally funded or assisted construction in Mississippi still falls under the Davis-Bacon Act and its weekly certified payroll.
No, Mississippi does not have a state prevailing wage law. The U.S. Department of Labor's list of states without prevailing wage laws includes Mississippi and, unlike most states on that list, shows no repeal date. That means there is no Mississippi wage schedule, no state certified payroll form, and no state agency setting construction rates for public work. The catch is federal money. Any Mississippi construction contract over $2,000 that is federally funded or federally assisted falls under the Davis-Bacon Act or one of its Related Acts, and those jobs come with federal wage determinations and weekly certified payroll.
| Rule | Mississippi |
|---|---|
| State prevailing wage law | None (listed by U.S. DOL as a state without one, no repeal date given) |
| State-only public work | No state wage schedule or state certified payroll requirement |
| Federal coverage | Davis-Bacon and Related Acts on federally funded or assisted construction over $2,000 |
| Who sets rates | U.S. Department of Labor wage determinations, published on SAM.gov |
| Certified payroll | Weekly, for each week covered work is performed; WH-347 is optional |
| Statement of Compliance | Signed by the contractor or sub with each payroll |
| Record retention (federal) | At least 3 years after all work on the prime contract is completed |
| Federal overtime | 1.5 times the regular rate over 40 hours on prime contracts over $100,000 (CWHSSA) |
What having no state law means on Mississippi jobs
On a county courthouse renovation or a school district gym paid entirely with local bond money, Mississippi law does not impose a minimum wage schedule by trade. You bid labor at what you actually pay, subject to normal federal and state wage and hour rules. That is a real bidding difference from states like Missouri or Nevada, where the same project would carry a state rate sheet and state payroll reporting.
Do not stop reading the spec book there, though. The project manual is where federal funding shows up. Look in the general conditions and supplementary conditions for a wage determination, a reference to Davis-Bacon, or federal contract clauses. If you see a wage decision number attached, the job is covered no matter who the owner is. Owners do not always flag the funding source on page one, and a missed determination is expensive to fix after you have paid six months of payroll at your own rates.
When federal prevailing wage applies in Mississippi
Davis-Bacon covers contracts in excess of $2,000 for the construction, alteration, or repair of public buildings or public works, when the contract is federally funded or assisted. The Related Acts extend it to projects that receive federal help through grants, loans, loan guarantees, or insurance. In Mississippi that commonly reaches work like a city water plant upgrade paid partly with a federal grant, a housing authority rehab, or a federal-aid road project let by a state or local agency. The prime is responsible for its subs' compliance too.
- Rates: use the wage determination in the bid documents. The Department of Labor posts Davis-Bacon determinations on SAM.gov, and the public can search them. See how to find the right Davis-Bacon wage determination.
- Classifications: pay each worker by the work actually performed, not the job title on the badge. Split hours when a worker does two kinds of work.
- Fringe benefits: pay them in cash or through bona fide plans; see fringe benefits.
- Overtime: on prime contracts over $100,000, the Contract Work Hours and Safety Standards Act requires 1.5 times the regular rate for hours over 40 in a workweek.
Certified payroll on federally funded Mississippi work
Federal rules require contractors and subs to submit certified payroll weekly, for each week in which covered work is performed, and the prime is responsible for submitting payrolls for all its subs. Each payroll goes with a signed Statement of Compliance certifying that the records are correct and complete and that every worker got at least the required rate. The Department of Labor's WH-347 is the usual form, but using it is optional as long as the same information is submitted another acceptable way. Payroll records, certified payrolls, and contract documents must be kept at least 3 years after all work on the prime contract is completed.
Apprentices can be paid less than the journeyworker rate only when individually registered in a program registered with the Department of Labor. The apprentice to journeyworker ratio on site cannot exceed what the registered program allows, and anyone working above the ratio must get the full rate. See apprentice ratio for how that plays out on a crew.
How this compares with states that have their own law
In prevailing wage states, a contractor can face two sets of rules on one job: a state rate sheet and filing schedule plus the federal one. In Mississippi you only manage the federal layer, and only on federally funded or assisted work. That makes Mississippi simpler on paper, but it also means fewer agency guides and no state hotline for prevailing wage questions. The federal Wage and Hour Division handles Davis-Bacon questions and complaints. Since the rules can change, confirm before bid day whether any new state or local requirement applies to your project.
If you also work across the line, compare Tennessee prevailing wage rules and Louisiana prevailing wage rules. For the rest of the Mississippi picture, see Mississippi contractor licensing, Mississippi lien rights, and Mississippi prompt payment. Smart Business Automator prepares weekly certified payroll from crew time on federally funded jobs and flags which projects need it. See certified payroll automation.
Frequently asked questions
Does Mississippi have a prevailing wage law?
No. The U.S. Department of Labor lists Mississippi among the states without a prevailing wage law. State and locally funded public jobs do not carry a state wage schedule.
Do I need certified payroll on a Mississippi public job?
Only when federal law requires it. Federally funded or assisted construction contracts over $2,000 fall under Davis-Bacon and need weekly certified payroll. The owner's contract may also require payroll reports on its own terms.
Where do I find prevailing wage rates for a Mississippi federal project?
Use the wage determination included in the bid documents. Davis-Bacon determinations are published on SAM.gov by the U.S. Department of Labor.
Is the WH-347 form required in Mississippi?
The WH-347 is optional. Federal rules require the weekly payroll information and a signed Statement of Compliance, and the WH-347 is the standard way to provide them.
Sources
- U.S. Department of Labor: State prevailing wage laws
- U.S. Department of Labor: Davis-Bacon and Related Acts
- U.S. Department of Labor: Form WH-347
- 29 CFR 5.5: Contract provisions and related matters (Cornell LII)
Laws and rates change. Confirm current requirements with the state agency before you bid, file, or pay. This page is general information, not legal advice.