Maine prevailing wage and certified payroll rules
Maine requires prevailing wages on public works funded in whole or in part by state funds when the contract is $50,000 or more. Rates come from the Maine Department of Labor by county and construction type, and certified payroll goes to the general contractor and the letting agency.
Yes, Maine has a prevailing wage law, and the trigger is $50,000. Title 26, chapter 15 of the Maine Revised Statutes calls it the fair minimum rate of wages and benefits. It applies to public schools, buildings, roads, bridges, sewers, waterworks, airports, and other structures funded in whole or in part by state funds when the contract amounts to $50,000 or more. The Maine Department of Labor says the project must receive state money dedicated to that project; general revenue sharing does not count, and maintenance work is excluded.
| Question | Maine answer |
|---|---|
| State law | 26 M.R.S. sections 1304 to 1315 (fair minimum rate of wages and benefits) |
| Covered work | Public works funded in whole or in part by state funds with a contract of $50,000 or more; also certain state-assisted renewable energy projects of 2 megawatts or more |
| Who sets rates | Maine Department of Labor, Bureau of Labor Standards, from an annual wage survey |
| Where to look up rates | MDOL Prevailing Wage Rates in Construction page, by county and category (Building 2, Highway and Earthwork, Heavy and Bridge) |
| Certified payroll | Each payroll period, MDOL Certified Payroll Form with a signed Statement of Compliance, to the general contractor and the letting agency; statute also requires monthly filing with the public authority |
| Record retention | Records kept at the job site; need not be kept longer than 3 years after the contract ends |
| Penalty | Forfeiture of not less than $250 for willful and knowing violations; workers can recover the shortfall plus an equal penalty and attorney's fees |
Which Maine projects are covered
The statute defines a public authority as the Maine Turnpike Authority or any state officer, board, commission, or agency authorized to contract for public works and supported by state funds. Coverage follows the money. A town building a $600,000 fire station with a dedicated state grant is covered. The same town paving a road with only local tax money is not. Work under $10,000, engineering and architectural services, and temporary or emergency repairs fall outside the definition of construction.
Maine added a second category in 2021: assisted projects. These are renewable energy or energy production projects with a nameplate capacity of 2 megawatts or more, bid on or after January 1, 2023, that receive state certifications for renewable energy credits or other state economic assistance. If you install solar arrays or wind turbines in Maine, check the bid package for the assisted project language.
How Maine sets and publishes rates
The Bureau of Labor Standards builds the rates from three data sets: a voluntary wage survey of contractors, certified payroll filed on state projects, and Davis-Bacon classification data. Under 26 M.R.S. section 1308, the bureau uses the highest wage and benefit figure of the three. If a new rate would drop below last year's, the decrease is limited to 15 percent. Unions submit their collectively bargained rates each year.
- Find the rate set: MDOL publishes current rates by county and category. Pick Building 2 (anything other than one or two family homes), Highway and Earthwork, or Heavy and Bridge. Building 1 data is no longer collected, so MDOL tells you to use Building 2 rates instead.
- Use the project determination: each covered contract must have a prevailing wage determination attached to the bid documents. That determination, not the general table, is what you owe on that job.
- Rates hold for the contract: once fair minimum rates are made part of a contract, they stay unchanged while the contract is in effect.
- Post it: the official determination must be posted at the work site in a prominent, accessible place by each contractor and subcontractor.
Certified payroll in Maine
MDOL says covered contractors and subcontractors must submit certified payroll information each payroll period. You send a copy of all payrolls to the general contractor and the state letting agency, along with a signed Statement of Compliance stating that each laborer or mechanic was paid at least the proper rate. Completing and submitting MDOL's Certified Payroll Form meets that requirement. The Bureau of Labor Standards reviews what you file.
Section 1311 adds the record rules. Keep an accurate record of every laborer, worker, mechanic, and independent contractor on the job: name, occupation, hours, job title, rate or method of pay, and actual wages paid. A copy stays at the job site, open to the bureau and the public authority, and a copy is filed monthly with the public authority. Filed records are public records, with rules to protect Social Security and taxpayer numbers. Note that Maine wants independent contractors on the record too, which catches some subs off guard.
Apprentices, penalties, and federal overlap
You may pay the apprentice rate only to a worker enrolled in a registered apprenticeship program, meaning one registered with the U.S. Department of Labor Office of Apprenticeship or a recognized state apprenticeship agency. Anyone else is paid the full rate for the classification. For the details, see apprentice rules on prevailing wage projects.
A contractor or subcontractor who willfully and knowingly violates the law faces a forfeiture of not less than $250. A worker paid less than the posted rate can recover the difference, a penalty equal to the difference, and reasonable attorney's fees. Kickbacks demanded as a condition of employment carry their own forfeiture of not less than $250.
Maine's law steps aside when the Davis-Bacon Act governs. Section 1314 says the state chapter does not apply to public works built in whole or in part with federal funds where the U.S. Secretary of Labor sets the wages. On those jobs, use the federal wage determination and the weekly federal payroll, usually on Form WH-347.
| Issue | Maine state law | Federal Davis-Bacon |
|---|---|---|
| Threshold | $50,000 contract, state funded | Contracts in excess of $2,000, federally funded or assisted |
| Rate source | MDOL annual survey, highest of three data sets | U.S. DOL wage determination |
| Payroll frequency | Each payroll period, plus monthly filing with the public authority | Weekly |
| Payroll goes to | General contractor and letting agency | Contracting agency |
Before bidding, confirm your trade licenses on the Maine contractor license page and know your payment and lien rights through Maine prompt payment and Maine mechanics lien law. Smart Business Automator prepares certified payroll from your time data and keeps each sub's filings in one place; see certified payroll automation.
Frequently asked questions
What is the prevailing wage threshold in Maine?
$50,000. Maine's law covers public works funded in whole or in part by state funds when the contract amounts to $50,000 or more. Contracts under $10,000 are excluded from the definition of construction altogether.
Where do I find Maine prevailing wage rates?
On the Maine Department of Labor's Prevailing Wage Rates in Construction page, by county and category. For an actual job, use the prevailing wage determination attached to the bid documents.
How often is certified payroll due in Maine?
MDOL says each payroll period, sent to the general contractor and the letting agency with a signed Statement of Compliance on the MDOL Certified Payroll Form. The statute also requires a copy of payroll records to be filed monthly with the public authority.
Do Maine rates apply on a federally funded job?
No. When federal funds are used and the U.S. Secretary of Labor sets wages under Davis-Bacon or a similar act, Maine's chapter does not apply. Follow the federal wage determination and weekly payroll instead.
Can rates go down in Maine?
Yes, but slowly. If a newly calculated rate would fall below the prior year's published rate, the statute limits the decrease to 15 percent.
Sources
- Maine Department of Labor: Prevailing Wage Rates in Construction
- Maine Department of Labor: Certified Payroll Reporting for Employers Paying Prevailing Wages
- Maine Revised Statutes, Title 26 section 1304: Definitions
- Maine Revised Statutes, Title 26 section 1306: Fair minimum rate of wages and benefits
- Maine Revised Statutes, Title 26 section 1308: Wage and benefits survey
- Maine Revised Statutes, Title 26 section 1311: Wage and benefit record of contractor
- Maine Revised Statutes, Title 26 section 1312: Penalties for violation
- Maine Revised Statutes, Title 26 section 1314: Exceptions
- U.S. Department of Labor: Prevailing Wage and the Davis-Bacon Act
Laws and rates change. Confirm current requirements with the state agency before you bid, file, or pay. This page is general information, not legal advice.