Iowa prevailing wage and certified payroll
Iowa has no state prevailing wage law. Bills to create one keep getting introduced and keep stalling in committee. Federally funded projects follow Davis-Bacon, and out-of-state contractors on Iowa public jobs face a reciprocal resident labor rule with its own records and penalties.
Iowa does not have a state prevailing wage law, so there are no Iowa state prevailing wage rates and no state certified payroll form. Lawmakers have filed bills to create one, most recently House File 478 in February 2025, but it was referred to committee and went no further. On a state, county, city, or school job paid with Iowa money, you pay at least minimum wage and overtime under the normal wage laws. On a project with federal funding, Davis-Bacon applies, with federal wage determinations and weekly certified payroll. The Iowa rule contractors trip over is a different one: the reciprocal resident bidder and labor force preference in Iowa Code 8A.311B.
| Item | Iowa rule |
|---|---|
| State prevailing wage law | None |
| Recent bills | HF 161 (introduced January 22, 2021) and HF 478 (introduced February 19, 2025) were referred to committee with no further action |
| Federally funded work | Davis-Bacon applies on federally funded or assisted contracts over $2,000 |
| Who sets rates on federal jobs | U.S. Department of Labor wage determinations, on SAM.gov |
| Certified payroll | No state form or portal. Federal jobs: weekly payrolls, WH-347 optional |
| Iowa public works rule to know | Reciprocal resident bidder and resident labor force preference, Iowa Code 8A.311B |
| Records under 8A.311B | Nonresident bidders from states with a labor force preference keep worker records at least 3 years |
| Penalties under 8A.311B | Up to $1,000, $5,000, then $15,000 per violation, per worker, per day |
Why Iowa has no prevailing wage
Iowa has no general prevailing wage statute for public improvements, and the bills that keep appearing would build one from scratch as a brand new chapter of the Iowa Code. HF 161 in 2021 and HF 478 in 2025 both proposed a new Iowa Code chapter called the Public Improvement Quality Protection Act, requiring local prevailing wage rates for people working on public improvements for public bodies, with remedies and penalties. Each was introduced and referred to committee. Neither passed. Until the legislature acts, an Iowa owner's bid package for a locally funded job should not carry a state wage schedule.
When Davis-Bacon applies in Iowa
Federal money brings federal wage rules. The Davis-Bacon Act and Related Acts cover federally funded or assisted contracts over $2,000 for building, altering, or repairing public buildings or public works, including projects that federal agencies support through grants, loans, loan guarantees, and insurance. In Iowa that can include a water or wastewater project built with a federal loan, federally assisted housing, or a federal-aid road job let by a county or city.
- Rates: the U.S. Department of Labor issues the wage determination. Owners pull it from SAM.gov and attach it to the bid documents.
- Overtime: on prime contracts over $100,000, the Contract Work Hours and Safety Standards Act requires time and a half over 40 hours in a workweek.
- Payroll: weekly certified payroll with a signed Statement of Compliance.
Certified payroll on Iowa federal jobs
With no state system, the federal process is the whole process. The Copeland Act requires a weekly statement of the wages paid each employee during the prior week. The WH-347 form is optional, but your report has to contain the same information and a signed Statement of Compliance. Payrolls go to the federal agency if it signed the contract, or to the owner, applicant, or sponsor, which forwards them to the agency that funded the work.
Say an excavating sub out of Cedar Rapids is on a federally funded lift station for a small town. The town's engineer may hold the pay app until every certified payroll for the period is in. Two missing weeks from a trucking sub can stall a $90,000 draw. Collect payrolls weekly, not at billing time; see how to collect certified payroll from subcontractors.
Iowa's reciprocal resident bidder and labor force rule
Iowa Code 8A.311B (moved from 73A.21 in 2023) applies to public improvements paid for in whole or in part with state or local funds, including road construction and maintenance. It does not set wages. It makes out-of-state contractors play by their home state's rules:
- Bidder preference: when a job goes to the lowest responsible bidder, an Iowa resident bidder gets the same preference against a nonresident that the nonresident's home state gives its own bidders. A resident bidder has done business from a place of business in Iowa for at least three years before the first advertisement.
- Labor force preference: if your home state requires a share of resident workers on its public jobs, you must apply that same resident labor rule on an Iowa public improvement. Idaho, for example, requires 95% bona fide Idaho residents on its state and local public works (contracts employing 50 or fewer people may use up to 10% nonresidents).
- Disclosure: nonresident bidders state on bid and contract documents whether their home state has such a preference.
- Federal money: the section is suspended to the extent it would cost federal funds or conflict with federal requirements.
The department enforces it on written complaint. It can inspect records, question workers, and demand records within ten days. If a contractor or sub misses that deadline, the department can tell the public body to withhold up to 25% of the payment due until the records arrive. A nonresident bidder from a labor preference state keeps records of every worker on the job for at least three years: name, address, phone number when available, Social Security number, trade classification, and the starting and ending time of employment. Civil penalties run up to $1,000 per violation in a first investigation, $5,000 in a second, and $15,000 for later ones, and each worker and each day counts separately.
Apprentices and other Iowa checks
Iowa has no state prevailing wage apprentice ratio. On Davis-Bacon work, follow the apprentice terms in the contract and your registered program; apprentice rules on prevailing wage projects explains them. Before bidding public work, also check the Iowa contractor registration and license guide, Iowa mechanics lien rules, and Iowa prompt payment and retainage.
Smart Business Automator tags each job by funding source, so federal jobs get weekly certified payroll and state-funded jobs do not. See certified payroll automation.
Frequently asked questions
Does Iowa have a prevailing wage law?
No. Iowa has no state prevailing wage law for public improvements. Bills such as HF 161 (2021) and HF 478 (2025) proposed one, but each was referred to committee and not passed.
Where do I find prevailing wage rates for an Iowa job?
Only federally funded or assisted jobs have them. The rates are in the Davis-Bacon wage determination attached to the bid documents, which is also posted on SAM.gov.
Is there an Iowa certified payroll form?
No. On federal jobs you submit weekly certified payroll under the Copeland Act, using the optional WH-347 or another format with the same information and a signed Statement of Compliance.
What is Iowa's resident labor force preference?
Under Iowa Code 8A.311B, a nonresident bidder from a state that requires resident workers on its public jobs must apply the same resident labor requirement on Iowa public improvements, keep worker records for at least three years, and faces civil penalties for violations.
Sources
- Iowa Legislature: Iowa Code 8A.311B, Reciprocal resident bidder and resident labor force preference
- Iowa Legislature: Iowa Code 73A.21 (transferred to 8A.311B)
- Iowa Legislature: HF 478 bill history (91st General Assembly)
- Iowa Legislature: HF 161 bill history (89th General Assembly)
- Iowa Legislature: HF 161 bill text, Public Improvement Quality Protection Act
- Idaho Legislature: Idaho Code 44-1001, Employment of residents of Idaho
- U.S. Department of Labor: Davis-Bacon and Related Acts
- U.S. Department of Labor: Form WH-347, Payroll
Laws and rates change. Confirm current requirements with the state agency before you bid, file, or pay. This page is general information, not legal advice.