What is a collateral warranty in construction?

A collateral warranty is a side contract that gives someone outside the main building contract, such as a funder, buyer, or tenant, a direct right to sue a contractor or designer for defective work. It is widely used in England and Wales. U.S. projects rarely use the name, relying on assignment of warranties and third party beneficiary clauses instead.

Two construction professionals review paper plans beside a tablet at a jobsite workbench.
Plan reviews connect field conditions, drawings, and the next decisions on a job. AI-generated illustration.

A collateral warranty is a separate agreement in which a contractor, subcontractor, or design consultant promises a third party that it has performed its contract with reasonable skill and care. The third party (often a bank, a future buyer, or a major tenant) is not a party to the building contract, so without the warranty it might have no contract claim if the work turns out to be defective. The collateral warranty creates that direct line. The term comes mostly from UK construction practice, and U.S. contractors usually meet it on projects with British or international owners or lenders.

Why collateral warranties exist

The basic idea is privity of contract: only the parties to a contract can usually enforce it. In England and Wales, the Contracts (Rights of Third Parties) Act 1999 lets a third party enforce a term if the contract expressly says it may, or if the term purports to confer a benefit on that party. Many building contracts exclude that Act, and the industry has kept using collateral warranties (or third party rights schedules) to give funders and tenants a clear, negotiated claim.

How it works on a real project

Say a developer is building a distribution warehouse with bank financing and a signed lease with a logistics tenant. The developer hires a design-build contractor, who hires a roofing sub and a structural engineer. The bank and the tenant each ask for collateral warranties from the contractor, the roofer, and the engineer. Five years later the roof leaks and the developer has sold the building. The tenant, who carries a repair obligation under its lease, can pursue the roofer directly under its warranty, subject to the warranty's limits.

  • Step-in rights: funders often get the right to take over the building contract if the developer defaults, so the job can be finished.
  • Assignment: the warranty may allow transfer a set number of times to later buyers or tenants.
  • Liability limits: the warrantor's liability is usually capped to what it would owe under its own contract, with a "no greater liability" clause.
  • Insurance: consultants are often required to keep professional indemnity insurance at a stated level for a stated period.

U.S. equivalents and common disputes

In the U.S., the same need is usually met with assignment of warranties to the owner or lender, third party beneficiary language in contracts, lender consent agreements, and manufacturer warranties. A U.S. sub who receives a collateral warranty form should read it as a new contract, because that is what it is.

  1. Signing a warranty that is broader than the subcontract, which creates liability you never priced.
  2. Missing a "no greater liability" or net contribution clause, so one party ends up carrying the whole loss.
  3. Agreeing to unlimited assignment, so you cannot tell who might hold a claim against you years later.
  4. Forgetting that the warranty may require insurance that outlives the job.

Related terms

Collateral warranties overlap with the warranty period, hold harmless clauses, and claims for a construction defect. Before signing any extra agreement a lender or owner sends, read how to read a construction contract before signing and the guide to flow-down clauses.

Frequently asked questions

Are collateral warranties used in the United States?

Rarely by that name. U.S. projects usually use assignment of warranties, third party beneficiary clauses, and lender consent agreements to give lenders and owners similar rights.

Who usually asks for a collateral warranty?

Funders, purchasers, and major tenants of a building, because they are not parties to the construction contract but would bear the cost of defects.

Is a collateral warranty the same as a product warranty?

No. A product warranty is a manufacturer's promise about a product. A collateral warranty is a promise by a contractor or designer to a third party that it performed its contract properly.

Should a subcontractor charge for giving one?

Many do, or at least negotiate the terms, because the warranty adds parties who can bring claims. Have the form reviewed by counsel before signing.

Sources

  1. legislation.gov.uk: Contracts (Rights of Third Parties) Act 1999, section 1
Written and edited by

Maurice Francois writes and edits construction operations guides for Smart Business Automator. More from Maurice on the Scaling Legends podcast.

Get a free assessment