What is a hold harmless clause in construction?
A hold harmless clause is a contract promise by one party (usually the contractor or subcontractor) to protect another party from claims, losses, and legal costs tied to the work. It usually runs downhill from owner to GC to sub, often paired with indemnity and a duty to defend. Many states restrict broad-form versions by statute.
A hold harmless clause, often paired with an indemnity clause, makes one party responsible for certain losses that would otherwise fall on someone else. In construction it usually runs downhill: the owner makes the general contractor hold it harmless, and the GC passes the same promise down to each sub through a flow-down clause. If a worker is hurt or a neighbor's property is damaged, the clause decides who pays the claim and the lawyers.
"Hold harmless" and "indemnify" are often used together and treated as one obligation, though some courts read them slightly differently. Many clauses also add a duty to defend, which means paying for the defense as soon as a claim is made, before anyone decides who was at fault.
The three common forms
| Form | What the sub agrees to cover |
|---|---|
| Limited | Only losses caused by the sub's own negligence, in proportion to its fault. |
| Intermediate | All losses tied to the work, including those partly caused by the GC or owner, but not their sole negligence. |
| Broad | All losses tied to the work, even those caused solely by the GC or owner. |
Many states limit the broad form. California Civil Code section 2782, for example, voids construction contract provisions that indemnify the promisee against its own sole negligence or willful misconduct, or against design defects it furnished, subject to listed exceptions. It also has separate rules for public agency contracts, private owner contracts entered on or after January 1, 2013, and residential construction. Other states have their own anti-indemnity statutes with different reach, so read the rule where the job is located.
How it plays out on a job
Say a drywall sub signs a subcontract with an intermediate-form hold harmless clause. A laborer for the electrical sub trips over a pallet of drywall left in a corridor and sues the GC. The GC tenders the claim to the drywall sub, citing the clause. Now the drywall sub's general liability insurance carrier is asked to defend the GC, assuming the sub's policy has contractual liability coverage and the GC is an additional insured.
If the clause was broad form and the GC had actually caused the hazard, a court in a state with an anti-indemnity statute might void that part of the clause. In a state without one, the sub could end up paying for the GC's mistake.
What to check before you sign
- Which form is it: limited, intermediate, or broad? Look for phrases like "regardless of whether caused in part" or "to the fullest extent permitted by law."
- Does it include a duty to defend, and when does it start?
- Is the promise capped at your insurance limits, or unlimited?
- Does your insurance cover the contractual liability you are taking on? Ask your agent before signing.
- Do waiver of subrogation and additional insured requirements line up with the indemnity language?
Common mistakes and disputes
- Signing a broad-form clause without telling the insurance agent, then learning the policy does not cover it.
- Assuming the state's anti-indemnity law will fix a bad clause. Many statutes have exceptions, and choice-of-law terms can point elsewhere.
- Passing down a clause to subs that is broader than the one the GC signed with the owner, which invites disputes.
- Not tracking certificates of insurance and endorsements, so the additional insured coverage the clause relies on has lapsed.
For more on risky terms, read construction contract clauses that hurt subcontractors. Smart Business Automator tracks each sub's insurance certificates and endorsements against contract requirements; see subcontractor compliance automation.
Frequently asked questions
Is a hold harmless clause the same as indemnification?
They are often used together and treated as the same promise. Some courts see hold harmless as a promise not to sue and indemnify as a promise to reimburse, so the exact wording matters.
Are broad-form hold harmless clauses enforceable?
Many states restrict them by statute, especially for losses caused solely by the party being protected. Rules differ by state and by public, private, or residential work.
Does my insurance cover a hold harmless agreement?
Commercial general liability policies often include some contractual liability coverage, but limits and exclusions vary. Confirm with your agent before signing.
Can I negotiate a hold harmless clause?
Yes. Common changes are limiting it to your own negligence, capping it at insurance limits, and making it mutual.