Georgia contractor license requirements
Georgia's State Licensing Board for Residential and General Contractors issues four license tiers: Residential-Basic, Residential-Light Commercial, General Contractor, and General Contractor Limited Tier. Each has its own experience, exam, insurance, and financial tests.
Georgia requires a state license to work as a residential or general contractor. The State Licensing Board for Residential and General Contractors, under the Georgia Secretary of State, splits the license into a Residential Division (Residential-Basic and Residential-Light Commercial) and a General Contractor Division (General Contractor and General Contractor Limited Tier). Applicants must be at least 21, show qualifying experience, pass an exam, carry liability insurance, and prove financial responsibility. Electrical, plumbing, conditioned air, low-voltage, and utility contractors are licensed separately under Chapter 14 of Title 43.
| Tier | Experience | General liability minimum | Financial requirement |
|---|---|---|---|
| Residential-Basic | 2 years with a residential contractor, plus responsibility for 2 residential-basic projects in the last 2 years | $300,000 | Proof of financial responsibility |
| Residential-Light Commercial | Degree plus 1 year, or 4 years of college and experience combined, or 4 years in construction including 2 with a residential contractor; 2 qualifying projects in the last 4 years | $500,000 | Proof of financial responsibility |
| General Contractor Limited Tier | Same as General Contractor | $500,000 | $25,000 net worth; contracts capped at $1,000,000 each |
| General Contractor | Degree plus 1 year with a GC, or 4 years of college and experience combined, or 4 years in construction with 2 years with a GC and 1 year in management roles | $500,000 | $150,000 net worth |
Who needs a Georgia contractor license
If you contract for residential construction or general construction in Georgia, you need the license for your tier. Local building officials point to a dollar trigger: Thomson-McDuffie County's licensing page, for example, says any remodeling work that costs over $2,500 requires a state license to contract and perform. Pulling a local business license is not the same thing. That county page makes the point bluntly, noting that nearly anyone with a business checking account and $100 can get a local business license.
Board rule 553-8-.01 also allows limited repair work by unlicensed people under strict conditions. The worker must disclose in writing that it is not licensed, may hire no one but its own employees to supervise the work, cannot affect life safety or structural integrity (no removing load-bearing walls or cutting structural beams), and must obtain the required permits and inspections. That repair rule does not change the separate licensing rules for electrical, plumbing, and conditioned air work.
General Contractor and Limited Tier requirements
Under rules 553-4-.01 and 553-4-.02, a general contractor applicant must be at least 21 and qualify one of three ways: a bachelor's degree in engineering, architecture, construction management, building construction, or another approved field plus at least 1 year of experience as or for a general contractor; a combination of accredited college coursework and practical experience totaling at least 4 years; or at least 4 years of construction-related experience, including 2 years as or for a general contractor and 1 year in administration, marketing, accounting, estimating, drafting, engineering, supervision, or project management.
- Net worth. $150,000 for the full General Contractor tier, $25,000 for the Limited Tier.
- Insurance. At least $500,000 of general liability insurance, plus workers' compensation as required by Georgia law.
- Limited Tier cap. A Limited Tier license is restricted to contracts of no more than $1,000,000 each, and change orders cannot push a contract past that limit.
- Moving up. Going from Limited Tier to the full tier requires a new General Contractor application that meets the full financial requirements.
The Limited Tier is a sensible entry point for a growing commercial firm. Picture a contractor whose biggest job is a $780,000 restaurant build-out. Limited Tier covers it with a $25,000 net worth. The trouble starts when that owner adds $260,000 of change orders and the contract crosses $1,000,000. The rule says change orders cannot exceed the per-contract maximum, so price growth on a Limited Tier job needs watching from the first change.
Residential-Basic and Residential-Light Commercial
Residential-Basic (rule 553-3-.01) requires two years of experience working for or with a residential contractor, mostly in residential-basic work, plus significant responsibility for at least two residential-basic projects in the two years before you apply. Liability coverage must be at least $300,000. Residential-Light Commercial (rule 553-3-.02) requires the same kind of degree, combination, or four-year experience path as the general tier, at least two years with a residential contractor on the experience path, and responsibility for two qualifying projects in the last four years, backed by a reference letter from a Georgia registered architect, engineer, or other acceptable reference. Its liability minimum is $500,000. Both require proof of financial responsibility and workers' compensation coverage as required by law.
The Georgia contractor exam
Every tier requires an exam unless the applicant is exempt under O.C.G.A. section 43-41-8. The board's rules list the content: practical application, reading plans and specifications, building codes, estimating, construction, ethics, responsibilities to the public, and Georgia law on contracting, workers' compensation, insurance, surety bonds, and liens. If you fail, you may retest within one year of your original application for a fee. A third or later attempt requires waiting at least one calendar year and filing a new application.
Renewal and continuing education
Georgia licenses renew every two years, with the renewal fee due by June 30 of even-numbered years. Renewals from July 1 through December 31 carry a penalty fee, and a license not renewed by December 31 is treated the same as a revoked license. Residential-Basic licensees need 3 hours of continuing education per year and Residential-Light Commercial licensees need 6 hours, measured July 1 through June 30. Online or correspondence courses can count for no more than half the hours, and course records must be kept for two years after the biennium. Fees are set in the board's separate fee schedule, so check it before you apply.
Georgia contractor license lookup
Verify a state-licensed contractor through the Secretary of State's verification site at verify.sos.ga.gov/verification/. Search by name or license number and confirm the tier matches the job: a Residential-Basic license does not cover a commercial build-out, and a Limited Tier license does not cover a $1.4 million contract. Before you sign, also review Georgia mechanics lien rules and Georgia prompt payment law, and confirm your local building permit process.
Frequently asked questions
What are the Georgia contractor license types?
Residential-Basic, Residential-Light Commercial, General Contractor, and General Contractor Limited Tier. Electrical, plumbing, conditioned air, low-voltage, and utility work are licensed separately under Title 43, Chapter 14.
What net worth do I need for a Georgia general contractor license?
The board's rules set $150,000 for the full General Contractor tier and $25,000 for the Limited Tier. Both tiers need at least $500,000 of general liability insurance.
What is the Georgia General Contractor Limited Tier?
It is a general contractor license limited to contracts of no more than $1,000,000 each. It has a lower net worth requirement of $25,000, and change orders cannot push a contract over the cap.
When do Georgia contractor licenses renew?
Every two years. The renewal fee is due by June 30 of even-numbered years. Late renewals through December 31 pay a penalty; after December 31 the license is treated as revoked.
How do I verify a Georgia contractor license?
Use the Georgia Secretary of State verification site at verify.sos.ga.gov/verification/ and check that the license tier fits the job.
Sources
- Georgia Rules: Chapter 553-4, Qualifications for Licensure, General Contractor Division
- Georgia Rules: Chapter 553-3, Qualifications for Licensure, Residential Contractor Division
- Georgia Rules: Chapter 553-12, License Renewal and Continuing Education
- Georgia Rules: Chapter 553-8, Definitions (repair rule)
- Georgia Rules: Chapter 553-6, Fees
- Thomson-McDuffie County: Licensed Contractors
- Georgia Secretary of State: license verification