Project delivery

What is a general contractor in construction?

A general contractor (GC) signs the prime contract with the owner and takes responsibility for delivering the whole project, usually by hiring and coordinating subcontractors for most of the trade work. The GC answers for cost, schedule, quality, and safety. Unlike an agency construction manager, a GC holds the trade contracts and carries cost risk on them.

Two construction professionals review paper plans beside a tablet at a jobsite workbench.
Plan reviews connect field conditions, drawings, and the next decisions on a job. AI-generated illustration.

A general contractor is the company that contracts directly with the owner to build a project and answers for all of it: cost, schedule, quality, and safety. The GC is the prime contractor. It may self-perform some work, like concrete or carpentry, but most of the trade scopes go out as subcontracts to electricians, plumbers, roofers, and other specialists.

The owner has one contract and one throat to choke. The GC has dozens of contracts below it and carries the risk that any of them falls short.

What a general contractor actually does

  • Prices the work. Estimators collect sub bids, run a quantity takeoff for self-performed scopes, and add general conditions, fee, and contingency.
  • Buys out the job. After award, the GC signs subcontracts and purchase orders and locks in costs during buyout.
  • Runs the site. A superintendent sequences trades, controls access, keeps the daily log, and enforces the safety plan.
  • Manages paper. A project manager handles RFIs, submittals, change orders, and the monthly pay application.
  • Pays the subs. Owner money flows to the GC first, then down the chain, usually minus retainage and against lien waivers.

How a GC works on a real job

Say a GC wins a $480,000 tenant improvement for a dental office. It self-performs framing and doors, and subs out drywall, electrical, plumbing, HVAC, flooring, and paint. That is six subcontracts, plus supplier POs for doors and hardware. Each month the GC collects pay requests from every sub, rolls them into one pay application to the owner, and waits for payment before paying the subs (if the subcontracts say so).

When the dentist asks to move an operatory wall, the GC prices it with the affected subs, submits one change order, and pushes the approved scope back down. The owner never talks price with the plumber directly. That single point of control is what the owner is paying the GC's fee for.

Licensing differs by state

Many states license general contractors, and the rules vary widely. California is a useful example. Its Contractors State License Board issues a Class B General Building license, and Business and Professions Code section 7057 defines that contractor's work as building structures using at least two unrelated building trades or crafts. Framing and carpentry do not count toward that two-trade test when a B contractor takes a prime contract for other trades. Other states license by dollar value, by trade, or only at the city or county level. Check the rules for your state on the contractor license by state pages, starting with California if you work there.

Common mistakes and disputes

  1. Thin buyout. The GC wins on a low sub number, then finds the sub excluded half the scope. Bid leveling before award prevents most of this.
  2. Scope gaps between subs. Nobody carried blocking, firestopping, or final clean. The GC owns the gap.
  3. Paying subs before getting paid. Cash flow breaks when the GC fronts money on a slow-paying owner.
  4. Loose compliance. An expired sub insurance certificate becomes the GC's problem when a claim hits.
  5. Confusing GC with construction manager. A construction manager may advise the owner and not hold the trade contracts. The risk profile is different.

Related terms

See subcontractor, design-bid-build, construction management at risk, and owner-contractor agreement. For the growth path from trade to GC, read how to grow from subcontractor to general contractor.

Smart Business Automator gives GCs one place to track subs, change orders, pay applications, and job costs across every project, with subcontractor compliance tracking built in.

Frequently asked questions

Is a general contractor the same as a prime contractor?

Usually, yes. The prime contractor is whoever holds the contract directly with the owner. On most projects that is the general contractor, though on multiple-prime public jobs several trade contractors can each hold a prime contract.

How does a general contractor make money?

Through a fee or markup on top of the cost of the work, plus any margin on self-performed scopes. On a lump sum job the profit is whatever is left after costs. On cost-plus or GMP work the fee is stated in the contract.

Does a general contractor need a license?

In many states, yes, at least above a certain job size or for certain work types. The requirements, exams, and bonding vary by state and sometimes by city, so check with the state licensing agency before bidding.

What is the difference between a GC and a construction manager?

A GC holds the trade contracts and carries cost risk on them. A construction manager can be an advisor only (agency CM) or can take on risk like a GC under a construction management at risk contract.

Sources

  1. California Contractors State License Board: Licensing classifications
  2. California Contractors State License Board: Class B General Building Contractor (B&P Code 7057)
Written and edited by

Maurice Francois writes and edits construction operations guides for Smart Business Automator. More from Maurice on the Scaling Legends podcast.

Get a free assessment