Electrical estimate template

An electrical estimate counts devices, fixtures, and gear, measures conduit and wire, and applies labor units (hours per unit) to each line to get total hours and cost. Download this template as a CSV or print it.

Two construction professionals review paper plans beside a tablet at a jobsite workbench.
Plan reviews connect field conditions, drawings, and the next decisions on a job. AI-generated illustration.

An electrical estimate template is built on labor units. Every item you count or measure (receptacles, switches, fixtures, feet of conduit, feet of wire, panels) gets a material cost and a labor unit, which is the hours it takes to install one unit. Quantity times labor unit gives total hours; hours times your labor rate gives labor cost. Add material, and the line is priced. The template below follows that method for a commercial tenant improvement, and the same columns work for residential wiring and service upgrades.

Electrical bids are won and lost on hours. Material prices are close between shops buying from the same supplier. The labor units are where your own experience shows up.

What the electrical estimate is for

This sheet is your internal cost build from the quantity takeoff. It turns counts and lengths into a price and, just as important, into an hour budget. When you win, those hours become what the foreman manages to each week, and the line items become billing lines on your schedule of values.

Work to the code your jurisdiction has adopted. The National Electrical Code is published by NFPA as NFPA 70, and states and cities adopt editions on their own timelines, sometimes with amendments. Note the adopted edition on the estimate when a requirement such as protection devices or wiring methods affects the price.

How to fill in each column

  • Item: a code you reuse, so actual hours can be compared to your units after the job.
  • Description: the device or material with its rating and spec, such as "20A spec grade duplex."
  • Quantity and unit: EA for devices, fixtures, and gear; LF for conduit and wire.
  • Material unit cost: current supplier price. Copper wire and gear pricing move, so refresh before each bid.
  • Labor unit: hours to install one unit. For conduit and wire, hours per foot.
  • Total labor hours: quantity times labor unit.
  • Labor rate: burdened hourly cost including payroll taxes, insurance, and benefits. See labor rate.
  • Line total: quantity times material unit cost, plus total labor hours times labor rate.

Electrical pricing tips

Put a validity date on your bid and price copper-heavy and gear-heavy jobs with care. Switchgear and some panels can have long lead times, so confirm availability before you commit to a schedule. If a quote is likely to change before award, look at how to handle material price escalation in bids.

Do not forget the items that are not on the drawings: temporary power, permit and inspection fees, lifts, fire stopping at penetrations, and coordination with the low-voltage and fire alarm trades. For overhead and margin by job type, see how to price electrical jobs.

Common electrical estimate mistakes

  1. Counting devices but forgetting boxes, rings, plates, and connectors.
  2. Measuring conduit runs straight on plan with no allowance for rises, drops, and offsets.
  3. Using the same labor units for new construction and remodel work.
  4. Pricing gear from an old quote, or missing its lead time.
  5. Leaving out temporary power and general conditions.

Related forms

After award, bill against your schedule of values with the electrical invoice template. For tools that keep estimates, hours, and billing in one place, see electrical software. The general method is in how to estimate labor hours for construction.

Smart Business Automator carries a won estimate into the job with its hour budgets, so the foreman and the office track the same numbers. See estimate to project handoff automation.

Electrical estimate worksheet

ItemDescriptionQuantityUnitMaterial unit costLabor unit (hrs)Total labor hoursLabor rateLine total
E-01Duplex receptacle, 20A spec grade, with box, ring, and plate42EA9.800.4518.988.002,074.80
E-023/4 in EMT conduit, incl. couplings and connectors650LF1.150.063988.004,179.50
E-0312 AWG THHN copper wire2,400LF0.320.00614.488.002,035.20
E-042x4 LED troffer, lay-in, with whip36EA118.000.932.488.007,099.20
E-05Wall occupancy sensor switch12EA46.000.5688.001,080.00
E-06225A panelboard, 42 circuit, set and terminate1EA2,650.00121288.003,706.00

Get the electrical estimate template as a spreadsheet. Opens in Excel or Google Sheets. We may email you once about the Smart Business Automator beta.

Stored in our private lead database. See our Privacy Policy.

  • Sample data only. Prices, labor units, and rates are made up for illustration; use your own production history.
  • Total labor hours = Quantity x Labor unit. Line total = (Quantity x Material unit cost) + (Total labor hours x Labor rate).
  • Apply a condition factor to hours for height, occupied space, or remodel work.
  • Add temporary power, permits, lifts, overhead, profit, and sales tax below the lines.
  • Note the code edition adopted by the jurisdiction and any lead-time assumptions for gear.

Frequently asked questions

What is a labor unit in electrical estimating?

The hours it takes to install one unit of an item, such as one receptacle or one foot of conduit. Multiply by quantity to get total hours for the line.

Where do electrical labor units come from?

Published labor unit manuals are a starting point, but your own job cost history is the best source. Compare estimated hours to actual hours after every job and adjust.

What code edition should I estimate to?

The edition of the National Electrical Code (NFPA 70) adopted by the authority having jurisdiction, plus any local amendments. Check with the local building or electrical inspection office.

Can I open this electrical estimate template in Excel?

Yes. Download the CSV and add formulas for total hours and line total so the sheet updates as quantities change.