How to price fencing jobs
Measure the fence line, subtract gate openings, build a material list per section and per post for the style, price gates separately, add burdened labor and site adders, then cover overhead and profit. Quote the result per linear foot plus gates.
To price a fencing job, measure the total fence line, subtract gate openings, and count sections and posts based on your post spacing for that style. Price the material for each section and post (including concrete), price each gate as its own item, then add labor hours per foot for the style and site, old fence removal, disposal, and equipment. Add overhead and profit on top. Most fence companies present the result as a price per linear foot by style and height, plus a price per gate, with adders for slopes, rock, and removal.
Pricing methods fence contractors use
- Per linear foot by style and height. The standard. A 6-foot wood privacy fence, 4-foot aluminum, and 6-foot chain link each have their own rate built from their own material list.
- Per gate. Gates carry heavier posts, hinges, latches, and extra labor. Price walk gates and double drive gates separately rather than burying them in the per-foot rate.
- Line-item estimate. Posts, sections, concrete, gates, removal, hauling, and permits each shown. Useful for commercial bids and for customers who want to compare.
- Unit prices for commercial work. Public and commercial bids often ask for unit prices per linear foot, per gate, per terminal post, and for adds such as barbed wire or privacy slats.
- Minimum charge for repairs. Replacing two posts or a sagging gate does not fit per-foot pricing. Set a minimum that covers the trip, the locate, and setup.
Step by step: building the number
- Measure the line and mark gates. Total footage, number of runs, corners, ends, and every gate with its width.
- Count sections and posts. Fence footage (minus gate openings) divided by your post spacing gives sections. Each run needs one more post than it has sections. Gate posts are usually heavier and priced separately.
- Build material per section. Pickets or panel, rails, fasteners, caps. For chain link: fabric, top rail, tension wire, ties, and fittings.
- Add concrete. Bags per post times posts. Use your own count per hole for the post size and hole depth you set.
- Price gates. Frame or kit, posts, hinges, latch, drop rod for double gates, and labor.
- Price labor. Hours per foot for the style from your past jobs, adjusted for slopes, rocky soil, roots, or tight access.
- Add removal, disposal, permits, and equipment.
- Add overhead and profit, then check the per-foot result against recent jobs of the same style.
Worked example: 180 feet of 6-foot wood privacy fence
This is a made-up example to show the math. Prices, spacing, and hours are placeholders, not market figures. Plug in your own supplier prices and crew data. The point is the structure, not the dollar figures.
Say the fence line is 180 feet in three runs, with a 4-foot walk gate and a 10-foot double drive gate. That leaves 166 feet of fence. At 8-foot sections, 166 divided by 8 is 20.75, so 21 sections. Three runs of fence need 24 line, corner, and end posts, plus heavier posts at the gates for 25 in all in this example. You set 2 bags of concrete per post, so 50 bags. The crew estimates 32 labor hours on this soil, and your burdened labor cost is $40 per hour.
| Line | Quantity | Rate | Amount |
|---|---|---|---|
| Posts | 25 | $18 each | $450 |
| Rails and pickets per section | 21 sections | $95 per section | $1,995 |
| Concrete | 50 bags | $7 per bag | $350 |
| Gates (walk and double drive) | 2 | Lot | $850 |
| Hardware and fasteners | Lot | $150 | $150 |
| Labor | 32 hours | $40 per hour | $1,280 |
| Auger rental and fuel | Lot | $100 | $100 |
| Direct cost subtotal | $5,175 | ||
| Overhead recovery | 32 hours | $16 per labor hour | $512 |
| Total cost | $5,687 | ||
| Profit at 15 percent markup on cost | $853 | ||
| Price | $6,540 |
That works out to about $36.33 per foot of total line, gates included. Now say the old chain link has to come out first and the back run sits on a slope that needs stepped sections. Removal, hauling, and slope labor add real cost, and a flat per-foot price copied from the last flat-yard job would miss all of it. Price those as separate adders so the customer sees why.
Overhead, labor burden, and markup
Labor cost is the wage plus payroll taxes, workers' compensation, and benefits, which together make the payroll burden. Workers' comp for digging and outdoor work can be significant, so get your actual rate from your insurer. Overhead is the truck and trailer, auger, yard, office, software, estimating time on quotes that never sign, and the owner's pay. Recover it with a rate per labor hour, as above, or a percentage of direct cost, and recheck it each season because fence volume often swings with weather.
Markup is a percentage of cost; margin is a percentage of price. A 15 percent markup gives about a 13 percent margin. Know which one you mean when you set targets. The guide on markup versus margin in construction shows the conversion.
Adders that protect your margin
- Old fence removal and disposal, priced per foot by type.
- Rocky or root-filled soil, as a per-hole adder or extra hours, with a clause in the contract.
- Slopes and grade changes that need stepped or racked sections.
- Tight access where material has to be carried in by hand.
- Permits and HOA paperwork time and fees.
- Rush scheduling or weekend work.
Track actual hours per foot
The fastest way to fix fence pricing is to track actual hours per foot by style and soil after every job. If vinyl jobs keep running long, raise that labor rate. If a supplier raises post prices mid-season, update the section costs the same week, and add an expiration date to every quote so an old price cannot be accepted months later. Smart Business Automator compares estimated and actual cost by job, so the next quote uses your own numbers instead of a guess.
Frequently asked questions
How do you estimate a fence job?
Measure the line, subtract gate openings, divide by post spacing for sections, count posts per run, build material per section and post, price gates separately, add labor hours per foot, removal, and permits, then add overhead and profit.
Should gates be included in the per-foot price?
It is better to price gates separately. They take heavier posts, hardware, and extra labor, and customers often add or remove gates during the sale.
How do I price fence removal?
Price it per linear foot by fence type, including disposal. Chain link with concrete footings takes more effort than wood panels set in soil, so track your hours by type.
How do I price fence repairs?
Use a minimum charge that covers the trip, the utility locate if you dig, setup, and cleanup, then add material and hours. Small repairs lose money at a per-foot rate.