How to price deck jobs
Price a deck by building it on paper: footings, framing, decking, railing, and stairs, each with its own material and labor. Add permit and disposal costs, overhead, and profit, then use the price per square foot only as a check.
To price a deck job, break the deck into its systems (footings, framing, decking, railing, stairs, and extras like lighting or skirting), take off the material for each one, and estimate crew hours for each at your burdened labor rate. Add the permit, inspections, demolition of any old deck, and dumpster or haul-off, then apply overhead and a profit margin. Divide by the deck's square footage at the end to see if the number looks sane. A per-square-foot price alone misses the parts that make decks expensive: height, railing length, and stairs.
Why square foot pricing fails on decks
Two 300 square foot decks can be worlds apart. One sits 18 inches off grade, attaches to a straight ledger, and needs a single step. The other is 9 feet up on a walkout basement, wraps a corner, and needs a full flight of stairs with a landing. The second has longer posts, more bracing, maybe twice the railing, and a lot more time on ladders. If both get the same square foot price, one of them loses money.
So most deck builders price in pieces. Decking and framing go by the square foot of deck surface. Railing goes by the linear foot. Stairs go per stair run or per riser. Footings go per footing. Then a lump sum covers the rest. The customer still sees one price, but you know where it came from, and you can show the effect when they ask for composite instead of pressure-treated or cable rail instead of wood balusters.
What goes into a deck estimate
- Site work and demolition. Tearing out an old deck, hauling it, and any grading or digging problems. Price demo separately so it can come off if the customer does it.
- Footings. Number of footings times the cost per footing (digging or augering, concrete or precast, hardware, and an inspection visit if your jurisdiction requires one before pouring).
- Framing. Posts, beams, joists, ledger, flashing, hangers, fasteners, and joist tape. Framing labor rises fast with height.
- Decking. Boards, hidden fasteners or screws, and picture framing or borders. Material choice drives this line more than any other.
- Railing. Posts, rails, balusters or infill, post caps, and any stair rail. Price per linear foot by system.
- Stairs. Stringers, treads, risers, landing pad, and handrail.
- Extras. Lighting, skirting, privacy screens, benches, built-in planters.
- Soft costs. Permit fee, plan drawing, inspections, dumpster, delivery charges, and your time for selections and the final walk.
Worked example: a 16 by 20 foot composite deck
This is an illustration with made-up costs. Use your own supplier quotes, crew rates, and production history. Say a homeowner wants a 16 by 20 foot deck, about 4 feet off grade, attached to the house with a ledger, composite decking on pressure-treated framing, aluminum railing on three open sides, and one stair run of 6 risers. No old deck to remove.
- Size. 16 x 20 = 320 square feet. Railing: two 16 foot sides plus a 20 foot side, minus a 4 foot stair opening = 48 linear feet, plus 2 stair rails.
- Footings. 6 footings at an example $95 each in material and hardware = $570.
- Framing material. Posts, beams, joists, ledger, flashing, and hardware: an example $2,400.
- Decking material. 320 square feet plus 10 percent waste as an example factor = 352 square feet of boards and fasteners at an example $8.50 per square foot = $2,992.
- Railing material. 48 feet at an example $55 per foot = $2,640, plus stair rail kits at $480. Total $3,120.
- Stair material. Stringers, treads, risers, and landing pad: $520.
- Labor. A three-person crew, 4.5 days at 8 hours = 108 hours. At an example burdened rate of $48 per hour, labor is $5,184. Burdened means wages plus payroll taxes, workers' comp, and benefits.
- Soft costs. Permit and drawings $450, dumpster and delivery $350. Total $800.
- Direct cost. $570 + $2,400 + $2,992 + $3,120 + $520 + $5,184 + $800 = $15,586.
- Overhead. If overhead runs 18 percent of direct cost (an example), add $2,805.48. Cost with overhead: $18,391.48.
- Profit as margin. For a 12 percent net margin, divide by 0.88: $18,391.48 / 0.88 = $20,899.41. Quote $20,900.
- Check. $20,900 / 320 = about $65 per square foot. Compare that with your last few composite decks of similar height.
| Line | Amount |
|---|---|
| Footings | $570.00 |
| Framing material | $2,400.00 |
| Decking material | $2,992.00 |
| Railing and stair rail | $3,120.00 |
| Stair material | $520.00 |
| Labor (108 hours burdened) | $5,184.00 |
| Permit, drawings, dumpster, delivery | $800.00 |
| Overhead at 18 percent of direct cost | $2,805.48 |
| Profit at 12 percent margin | $2,507.93 |
| Price (rounded) | $20,900.00 |
Notice that railing material alone is larger than framing material in this example. That is common with metal or glass systems, and it is why railing belongs on its own line. If the homeowner switches to a cheaper rail, you can show the drop in one number without rebuilding the bid.
Labor rates, overhead, and markup
Start from your actual wage costs. For reference, the Bureau of Labor Statistics reported a median wage of $29.12 per hour for carpenters in May 2025. Your burdened rate will be higher once payroll taxes, workers' comp, and benefits go on top, and local wages vary widely. Work it out with how to calculate labor burden.
Overhead covers the truck, trailer, tools, office, insurance not charged to the job, your estimating time, and the design visits that never turn into jobs. Divide annual overhead by annual direct cost to get your rate; see how to calculate construction overhead rate. Then add profit as a margin, not a markup. A 12 percent markup on $18,391.48 gives $20,598.46, which is only a 10.7 percent margin. The difference is explained in markup vs margin in construction.
Unit prices deck builders use
| Item | Usual unit | Adjust for |
|---|---|---|
| Framing and decking | Per square foot of deck | Height, material, diagonal or patterned boards, borders |
| Railing | Per linear foot | System type (wood, aluminum, cable, glass), corners |
| Stairs | Per stair run or per riser | Width, landings, enclosed risers |
| Footings | Per footing | Frost depth, soil, auger access |
| Demolition | Per square foot or lump sum | Height, disposal costs, rot surprises |
| Lighting | Per fixture plus transformer | Wiring runs, electrician needed |
| Board replacement and repair | Hourly plus materials, with a minimum | Matching old material, hidden rot |
Repair work is where small deck jobs lose money. Replacing twelve boards still means a trip, a supply run, and setup. Set a minimum charge built from a half day of crew time, and price unknowns such as rotted joists under old boards as time and materials with the rates written into the proposal. The guide on how to price small construction jobs profitably covers minimums in more detail.
Mistakes that sink deck bids
- Quoting from a square foot number without checking height, railing length, and stairs.
- Forgetting the ledger work: removing siding, flashing, and repairing trim on the house wall.
- Leaving out permit time. Plan review and inspections can hold a crew off the site, so schedule around them.
- No allowance for hidden rot when replacing an old deck on the same footprint. Write it as an allowance or T&M line.
- Taking a small deposit on a large special-order railing. Set a payment schedule that covers materials at order; see how to set up deposit and payment schedules.
- Never comparing estimated hours to actual hours. Track it with job costing and adjust your production rates.
Use the construction estimate template to lay out lines like the example above, and the construction invoice template for deposits and progress bills. For trade-specific tools, see deck software. Smart Business Automator carries the estimate lines into the project budget so you can compare estimated and actual hours on every deck, starting at $19 per user per month.
Frequently asked questions
Should I price decks per square foot?
Use square foot pricing for framing and decking, but price railing per linear foot, stairs per run or riser, and footings per footing. Then check the total per square foot against your past jobs.
How do I price deck railing?
Measure the open sides that need guards, subtract stair openings, add stair rails, and multiply by your installed cost per linear foot for the chosen system. Corners and posts add cost, so count them.
How much waste should I add for decking?
It depends on the board lengths you can buy, the layout, and patterns like diagonals or borders. Compare boards ordered with boards installed on past jobs and set the factor from your own numbers.
How do I handle rot I cannot see until demolition?
Write an allowance or a time and materials line for hidden damage into the proposal, with your rates stated, and get a signed change order before fixing anything beyond it.
Should the permit fee be in the deck price?
Yes, along with the time to prepare drawings and attend inspections. List it as its own line so the homeowner sees what it covers.