E-Verify rules for construction employers
E-Verify is voluntary for most private employers under federal law, but it becomes mandatory when you hold a covered federal contract or subcontract, and some states require it for some or all employers. Form I-9 is required for every new hire regardless.
Construction employers must use E-Verify in two situations: when a federal prime contract or subcontract includes FAR clause 52.222-54, and when their state's law requires it. Outside those, E-Verify is generally optional at the federal level, while Form I-9 is required for every hire. The rules that catch contractors are the timing (days after award, days after hire) and the flow-down to subcontractors.
Start with Form I-9, which applies to everyone
E-Verify runs on Form I-9 data, so the I-9 comes first. Under 8 CFR 274a.2, the employee completes Section 1 at the time of hire. The employer examines documents and completes Section 2 within three business days of the hire. If the job will last less than three business days, Section 2 must be done on the first day, and a receipt cannot stand in for a document. Keep each I-9 for three years after the hire date or one year after employment ends, whichever is later.
On a job site with day labor and short stints, that first-day rule matters. A three-day demo crew hired Monday needs Section 2 done Monday.
Federal contracts: FAR 52.222-54
Under FAR 22.1803, contracting officers insert clause 52.222-54 in contracts that exceed $150,000 with a period of performance of 120 days or more, with exceptions for work performed entirely outside the United States and for contracts only for commercially available off-the-shelf items. A $2 million federal building renovation will almost always have it. A 60-day $90,000 repair contract will not.
| Requirement | Deadline |
|---|---|
| Enroll in E-Verify as a federal contractor | Within 30 calendar days of contract award |
| Start using E-Verify for new hires | Within 90 calendar days of enrollment; then each new hire within 3 business days after the hire date |
| Verify existing employees assigned to the contract | Within 90 calendar days after enrollment or within 30 calendar days of the employee's assignment, whichever is later |
| Optional: verify entire existing workforce hired after November 6, 1986 | Within 180 calendar days of enrollment or of notifying E-Verify Operations |
Contractors already enrolled at award follow slightly different timing measured from award or from their original enrollment date, so read paragraph (b)(2) of the clause.
Subcontractor flow-down
The clause must flow down to each subcontract for services or construction performed in the United States with a value of more than $3,500. That threshold is low. Nearly every trade sub on a federal job is covered, and the prime is the one who has to put the clause in the subcontract. See how to subcontract on federal construction projects and the federal construction contract compliance checklist.
State E-Verify mandates
States vary widely, and the rules change often. Two examples from statute show the range:
- Arizona: A.R.S. 23-214 requires every employer, after hiring an employee, to verify employment eligibility through E-Verify, for hires after December 31, 2007.
- Florida: Fla. Stat. 448.095 requires private employers with 25 or more employees to use E-Verify beginning July 1, 2023, verifying each new employee within three business days after the employee starts work for pay, and keeping documentation for at least three years. After three findings of noncompliance in a 24-month period, the state must fine the employer $1,000 per day until cured.
Other states mandate E-Verify only for public employers or public contractors, and some states restrict how employers may use it. Before you hire in a new state, check that state's labor or commerce agency. This is especially important when you run payroll across multiple states.
How to set up E-Verify compliance in 6 steps
- Map your obligations. List every state you hire in and every active federal contract with the clause.
- Fix the I-9 process first. Section 2 within three business days, on the first day for jobs shorter than that, and the same checklist for every hire.
- Enroll and train. Enroll the company and train at least two people so a vacation does not stall hiring.
- Create cases on time. E-Verify instructs employers to create a case no later than the third business day after the employee starts work for pay.
- Handle mismatches by the book. If E-Verify returns a tentative nonconfirmation, notify the employee so they can decide whether to take action. Follow the E-Verify user manual for the steps.
- Flow down and collect proof. Add the clause to covered subcontracts and ask subs to confirm enrollment.
Who should run E-Verify in a construction company
Hiring in construction happens in the field. A foreman picks up two laborers on Monday, and the office hears about it Wednesday when timecards come in. That gap is where I-9 and E-Verify deadlines get missed. The fix is a rule that nobody clocks in until the office has the Section 1 form and a scheduled document review, plus a weekly report comparing new names on payroll to completed I-9s and E-Verify cases.
Keep the work in the office with one owner and a trained backup, not spread across superintendents. Store I-9s apart from personnel files so you can hand them over cleanly if asked, and keep the E-Verify case result with each form. When a federal job ends, do not stop: if you enrolled as a federal contractor, check the terms of your memorandum of understanding before changing how you use the system.
Worked example: a GC wins its first federal job
Say a 30-person GC in Georgia is awarded a $1.8 million, 10-month renovation at a federal facility on May 1. It is not enrolled in E-Verify. It must enroll by May 31. Once enrolled on, say, May 20, it has until August 18 (90 days) to start running new hires through E-Verify. Its superintendent and two carpenters assigned to the job are existing employees, so they must be verified by the later of 90 days after enrollment or 30 days after assignment.
The GC has seven subs on the job, each above $3,500. All seven subcontracts get the clause. The drywall sub, which works only private jobs, has to enroll too. The GC adds a line to its subcontractor onboarding checklist and tracks each sub's enrollment confirmation alongside its insurance certificates.
Mistakes to avoid
- Running E-Verify on applicants before an offer. E-Verify cases are created after hire using I-9 data.
- Using E-Verify only for workers who look or sound foreign. Apply the process the same way to everyone it covers.
- Forgetting the flow-down to subs on federal work.
- Missing the first-day I-9 rule on jobs shorter than three business days.
- Discarding I-9s too early. Use the later of three years after hire or one year after termination.
Related terms and tools
See how to onboard new construction employees, construction document retention, and the glossary entry for E-Verify. Smart Business Automator tracks subcontractor documents and compliance status, including federal job requirements, through public works contractor automation.
Frequently asked questions
Is E-Verify required for construction companies?
Not everywhere. It is required when you have a federal contract or subcontract with FAR clause 52.222-54, and when your state's law requires it. Form I-9 is required for every new hire in every state.
What is the E-Verify threshold for federal subcontractors?
FAR 52.222-54 flows down to subcontracts for services or construction performed in the U.S. with a value of more than $3,500.
How soon must a federal contractor enroll in E-Verify?
Within 30 calendar days of contract award if not already enrolled, then begin using it for new hires within 90 calendar days of enrollment.
Can I use E-Verify to screen job applicants?
No. E-Verify cases are created after the person is hired, using the completed Form I-9, no later than the third business day after the employee starts work for pay.
How long do I keep Form I-9?
Three years after the date of hire or one year after employment ends, whichever is later, under 8 CFR 274a.2.
Sources
- Acquisition.gov: FAR 52.222-54 Employment Eligibility Verification
- Acquisition.gov: FAR 22.1803 Contract clause
- Cornell LII: 8 CFR 274a.2 Verification of identity and employment authorization
- E-Verify.gov: Verification process
- E-Verify.gov: Federal contractors
- Arizona Legislature: A.R.S. 23-214 Verification of employment eligibility
- Florida Legislature: Fla. Stat. 448.095 Employment eligibility