What is profit margin in construction?
Profit margin is profit expressed as a percentage of revenue. Gross margin measures what a job earns after direct costs, and net margin measures what the company keeps after overhead and other expenses. Margin is always figured on the selling price, not cost, so a 25 percent markup on cost produces a 20 percent margin.
Profit margin answers a simple question: out of every dollar the customer pays, how many cents does the contractor keep? It is always calculated on revenue (the selling price), not on cost. That one detail is why so many contractors think they are making more than they are.
Two margins matter. Gross margin is revenue minus direct job costs, divided by revenue. It shows how well jobs are estimated and run. Net margin is what is left after overhead, interest, and other company expenses, divided by revenue. It shows whether the business actually makes money. See gross profit and net profit margin for each term on its own.
Margin vs. markup
Markup is a percentage added to cost. Margin is a percentage of the selling price. The same dollars give different percentages.
| Item | Amount |
|---|---|
| Estimated job cost | $100,000 |
| Markup at 20% of cost | $20,000 |
| Selling price | $120,000 |
| Gross margin ($20,000 / $120,000) | 16.7% |
If the company needs a 20 percent gross margin to cover overhead and profit, it has to mark up costs by 25 percent: $100,000 times 1.25 is $125,000, and $25,000 divided by $125,000 is 20 percent.
A worked example on a real job
Say a concrete sub bids a $350,000 parking deck repair at an estimated $280,000 of cost, a planned gross margin of 20 percent. Midway through, extra delamination is found. The GC approves $18,000 of the extra work, but the sub spends $31,000 on it, and labor on the base scope runs $12,800 over budget.
At closeout, revenue is $368,000 and cost is $323,800 ($280,000, plus $31,000 of extra work, plus $12,800 in labor overrun). Gross profit is $44,200, a gross margin of 12 percent instead of 20. After the company's 10 percent overhead load, there is very little left. That slide between the bid margin and the final margin is called margin fade.
Common mistakes
- Confusing markup with margin when setting prices.
- Looking only at gross margin and forgetting overhead, which can turn a 15 percent gross margin into a loss.
- Not tracking margin during the job, so fade is found only at closeout.
- Pricing change orders at lower margins than the base contract, even though they disrupt the work more.
- Letting a few big jobs hide losses on many small ones.
Margin also has to be measured the same way every time. If one PM counts general conditions as job cost and another does not, their margins cannot be compared. Set the rule once, write it down, and apply it to every job report.
Related terms
Profit margin connects to job costing, cost to complete, the WIP report, and contingency. For pricing math, see how to set construction markup and profit margin and how to find margin fade on construction projects. Smart Business Automator tracks projected margin on each job as costs come in. See job costing and WIP automation.
Frequently asked questions
How do you calculate profit margin?
Divide profit by revenue. For gross margin, profit is revenue minus direct job costs. For net margin, it is revenue minus all costs including overhead.
What markup gives a 20 percent margin?
A 25 percent markup on cost. In general, markup equals margin divided by one minus margin.
What is a good profit margin for contractors?
It depends on trade, size, risk, and market. Set targets from your own overhead and profit goals rather than a general rule.
What is margin fade?
The drop between the margin in the original estimate and the margin the job actually earns, usually caused by cost overruns, unpriced extra work, or productivity losses.